A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2015; you can also visit the original URL.
The file type is application/pdf
.
Dynamic Lot Optimization of Assembly Supply Chain with Delivery Time Constraint
2013
International Business Research
In this paper, we investigate operational decision optimization problem of assembly manufacturing capacitated supply chain. Open equations of this system in all planning periods are set up. Delivery time to clients form a time window that limits point to assembly manufacturer delivery start and end time. The system model divide planning time into many equally periods, and decisions can vary with time. Ability constraint in the process of supply chain operation, time constraints and assembly
doi:10.5539/ibr.v6n11p73
fatcat:voqzvxynyvbclehpgmasbjbqnq