Beam Scrubbing for RHIC Polarized Proton Operation [report]

Zhang S. Y., W. Fischer, H. Huang, T. Roser
2003 unpublished
One of the intensity limiting factor of RHIC polarized proton operation is the electron cloud induced pressure rise. A beam scrubbing study shows that with a reasonable period of time of running high intensity 112-bunch proton beam, the pressure rise can be reduced, allowing higher beam intensity.
doi:10.2172/1061716 fatcat:xcti2jrmqvcybfitejbsjv6ste