A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2017; you can also visit the original URL.
The file type is application/pdf
.
Stream-Reach Identification for New Run-of-River Hydropower Development through a Merit Matrix–Based Geospatial Algorithm
2014
Journal of water resources planning and management
Even after a century of development, the total hydropower potential from undeveloped rivers is still considered to be abundant in the United States. However, unlike evaluating hydropower potential at existing hydropower plants or nonpowered dams, locating a feasible new hydropower plant involves many unknowns; hence, the total undeveloped potential is harder to quantify. In light of the rapid development of multiple national geospatial data sets for topography, hydrology, and environmental
doi:10.1061/(asce)wr.1943-5452.0000429
fatcat:jcxkwrf4hrfppj5qybnlwrdb54