A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2017; you can also visit the original URL.
The file type is application/pdf
.
CALCULATION OF RESIDUAL LIFETIME FOR LIFTING INSTALATION – GANTRY CRANE MPT 20/5
2013
Fiabilitate şi Durabilitate
In this paper is presented step-by-step the calculus made in order to establishing the residuallifetime of a lifting crane using also non-destructive methods to establish the actual state of machine andareas subject to study, conducting to an extension up to 5 times of residual lifetime,but at 2/3 from initialload.
doaj:ef601917397443019594963e8c0a8df9
fatcat:oj7ta3dqfnf2xjriqim2ooaxfy