A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2017; you can also visit the original URL.
The file type is application/pdf
.
Construction and use of roadmaps that incorporate workspace modeling errors
2013
2013 IEEE/RSJ International Conference on Intelligent Robots and Systems
Probabilistic Roadmap Methods (PRMs) have been shown to work well at solving high Degree of Freedom (DoF) motion planning problems. They work by constructing a roadmap that approximates the topology of collisionfree configuration space. However, this requires an accurate model of the robot's workspace in order to test if a sampled configuration is in collision or not. In this paper, we present a method for roadmap construction that can be used in workspaces with uncertainty in the model. For
doi:10.1109/iros.2013.6696512
dblp:conf/iros/MaloneMWT13
fatcat:e7puc4fuwvadlfzseaqy6z4hjy