Joint optimal flood control operation of large scale mixed reservoirs
2018
MATEC Web of Conferences
With the reservoir construction gradually completed, joint operation of reservoir groups is an important measure to realize reservoir flood control potential,but when the river basin is large, the flood channel routing and time-lag cannot be simplified, in addition, the curse of dimensionality is very difficult for model solving With the expansion of the number of reservoirs. These factors restrict the application of joint operation of large scale mixed reservoirs.In this study, The DP-POA
doi:10.1051/matecconf/201824601088