A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2020; you can also visit the original URL.
The file type is application/pdf
.
Construction Materials Flow Investigation – Delay Evaluation in a Sand Supply Chain With Simulation
2020
Proc. 28th Annual Conference of the International Group for Lean Construction (IGLC)
unpublished
The construction sector is considered one of the largest resource consumers on the planet and one of the main productive sectors of the economy. This scenario justifies the study of the flow of materials used in the construction, from the systematization of its processes, to reduce waste and improve the processes involved. This research aims to develop a simulation model of a residential building sand supply chain with the application of the delay meter and its monetary impacts on the
doi:10.24928/2020/0023
fatcat:npd5jkk3svbibn2n4aa4moriza