A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2022; you can also visit the original URL.
The file type is application/pdf
.
Application of openBIM for the Management of Existing Railway Infrastructure: Case Study of the Cancello–Benevento Railway Line
2022
Sustainability
In the field of infrastructure, the development and application of the openBIM (open Building Information Modeling) approach and related standards (principally Industry Foundation Classes) remain limited with regard to processes in O&M (Operation and Maintenance) phases, as well as the broader context of AM (Asset Management). This article deals with the activities carried out as part of a pilot project based on the need to manage the operation and assess the condition and value of existing
doi:10.3390/su14042283
fatcat:mefgcqal75frfkz6tdhnnc73ym