Integrated Transmission and Storage Systems Investment Planning Hosting Wind Power Generation: Continuous-time Hybrid Stochastic/Robust Optimization
2019
IET Generation, Transmission & Distribution
In this study, a continuous-time hybrid stochastic/robust optimisation is proposed for the integrated investment in transmission lines (TLs) and energy storage systems (ESSs) with high penetration of uncertain wind power generation (WPG) sources from a central planner viewpoint. The main objective of the problem is to achieve a simultaneous expansion of transmission assets, TLs and ESSs, whereas minimising the investment cost while taking the operational aspects of a power system into account
doi:10.1049/iet-gtd.2019.0257