A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2020; you can also visit the original URL.
The file type is application/pdf
.
An Improve Object-oriented Approach for Multi-objective Flexible Job-shop Scheduling Problem (FJSP)
2019
Zenodo
Flexible manufacturing systems are not easy to control and it is difficult to generate controlling systems for this problem domain. Flexible job-shop scheduling problem (FJSP) is one of the instances in this domain. It is a problem which acquires the job-shop scheduling problems (JSP). FJSP has additional routing subproblem in addition to JSP. In routing sub-problem each task is assigned to a machine out of a set of capable machines. In scheduling sub-problem, the sequence of assigned
doi:10.5281/zenodo.3582349
fatcat:rjmp2rod7bfwpif3lgrguynqjq