Optimization of Pipe Production Scheduling in Line 18 Using First Come First Serve (Fcfs), Earlier Due Date (Edd), Short Process Time (Spt) Methods (Case Study: Pt Wtur)
2021
PROZIMA (Productivity Optimization and Manufacturing System Engineering)
For machine line 18, is intended to produce PVC pipe with a 5 ", 6" and 8 "with each contained item type AW and type D with a turn of the cycle a certain schedule. From the turn of this cycle, there are a couple of the impact is too long good finish duration of vacant stock in the Warehouse Production (GHP) pipe. The impact of the long duration of the good stock of empty finish unachieved impact on consumer demand (in this case the agent). By not reaching the consumer demand impact on service