IDC Reengineering Iteration I2 Architectural Prototype Reports [report]

Benjamin R. Hamlet
2014 unpublished
To fulfill the inception phase deliverable "Demonstration of architectural prototype" the SNL IDC Reengineering project team is providing seven reports describing system prototyping work completed between October 2012 and October 2014as part of the SNL US NDC Modernization project. The SNL team has previously briefed the IDC on thestatus of each of these prototypes.
doi:10.2172/1173200 fatcat:gxmp4y2wzvgxneb3xxvrt2kqcm