EVALUASI DAN USULAN PERBAIKAN KESEIMBANGAN LINTASAN PRODUKSI UNTUK MENCAPAI TARGET PRODUKSI DENGAN PENDEKATAN SIMULASI PADA WORKSHOP 3 DI PT. FACO GLOBAL ENGINEERING
2013
JURNAL TEKNIK INDUSTRI
<p>PT. FACO Global Engineering is a national company that manufactures Transformer Tank.<br />The problems that arise on the production floor in Workshop 3 is a common difficulty in achieving<br />production targets precisely at the appointed time this problem may be related to its unbalanced<br />production line .. Average yield Transformer Tank produced today is 1 unit per week, while the<br />production target set is 2 units per week.<br />The methodology used is to use the simulation. The