EVALUASI DAN USULAN PERBAIKAN KESEIMBANGAN LINTASAN PRODUKSI UNTUK MENCAPAI TARGET PRODUKSI DENGAN PENDEKATAN SIMULASI PADA WORKSHOP 3 DI PT. FACO GLOBAL ENGINEERING

Reza Primadhana, Parwadi Moengin, Sucipto Adisuwiryo
2013 JURNAL TEKNIK INDUSTRI  
<p>PT. FACO Global Engineering is a national company that manufactures Transformer Tank.<br />The problems that arise on the production floor in Workshop 3 is a common difficulty in achieving<br />production targets precisely at the appointed time this problem may be related to its unbalanced<br />production line .. Average yield Transformer Tank produced today is 1 unit per week, while the<br />production target set is 2 units per week.<br />The methodology used is to use the simulation. The
more » ... ta obtained was then calculated and<br />analyzed the workload of each station. Utility work station is currently the largest existing utilities in<br />the workstation and welding with a cutting wheel percentages respectively 91.65% and 76.45%. For<br />utility work station is the smallest percentage of work stations fullfitting with 3.76%. This can be<br />overcome by the proposed model are given 6. Model 2 the best proposal is the transfer station operator<br />to work painting and cutting wheel 1 fullfitting operator work station to drilling.</p>
doi:10.25105/jti.v3i2.1580 fatcat:szjjpfy3x5bapjipzxu7dwn6kq