A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2017; you can also visit the original URL.
The file type is application/pdf
.
The Automation of Construction Scheduling Considering Variability of Working Environment
2010
Proceedings -- The 27th International Symposium on Automation and Robotics in Construction
unpublished
The duration of building jobs is affected by numbers of different factors what causes that after short period of time schedules, not once, begin to differ from real run of construction. The attainment of stronger stability of the schedules requires to consider variability of factors affecting run of construction within phase of scheduling. This article deals with scheduling methodology which would cover variability of working environment affecting run of construction and possibilities of the automation of scheduling.
doi:10.22260/isarc2010/0057
fatcat:2gv6aor57re2jmbe6unplmmpjq