Probabilistic Project Duration Estimation Based on Uncertainty of Linkage between Activities
2020
Journal of Civil Engineering and Architecture
Generally, one of the most difficult works at scheduling is to estimate the duration of activities and linkages between them because the possibility that the duration and linkages could be exposed to the uncertainties is very high. When estimating project duration, therefore, the probabilistic estimation of the duration as well as the probabilistic estimation of the linkages between activities should be considered concurrently. The Project Evaluation and Review Technique (PERT) that is