Improved Memetic Algorithm for Economic Load Dispatch in a Large Hydropower Plant
[chapter]
2022
Technological Innovations and Advances in Hydropower Engineering
This paper is intended to study the method of solving the economic load dispatch problem (ELDP) of hydropower plants via using memetic algorithm. Based on characteristics of economical operation of the hydropower plant, this paper proposes an improvement method of mutation operator and selection operator of memetic algorithm. Taking Three Gorges hydropower station in China as an example, the performance of memetic algorithm before and after improvement is tested separately. The test result