RETOOLING NIGERIAS ELECTRICITY GENERATION SUB – SYSTEM FOR SUSTAINABLE GRID OPERATION
2020
figshare.com
Experts are varied in estimating the amount of power needed for national development. One expert estimated 297,900 MW by the year 2030 using a 13 percent Gross Domestic Product (GDP). The Power Sector Road Map's aspiration is 40,000 MW by the year 2020 while the preferred Vision 20:2020 target is 40GW (40,000 MW) available capacity. Vision 20:2020 further proposed that hydro sources contribute 10% of this value; thermal, 80%; coal, 6% and renewables, 4%. However, as at December 2017, Nigeria's
doi:10.6084/m9.figshare.13435211.v1