A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2021; you can also visit the original URL.
The file type is application/pdf
.
Reconstruction of the Dewey Square tunnel
1998
This paper discusses preliminary design and construction staging plans to reconstruct the existing Dewey Square Tunnel in Boston as a part of the Massachusetts Highway Department (MHD) Central Artery Project. This highway tunnel, part of the existing Central Artery 1-93 alignment, is to be upgraded to satisfy current highway standards. The design includes extensive structural modifications and a program of inspection and material testing of the existing tunnel.
doi:10.5169/seals-59069
fatcat:xvtynif5ozhvni34pbhoh5nmvu