A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2019; you can also visit the original URL.
The file type is application/pdf
.
Acceptance of Construction Scheduling Visualizations: Bar-charts, Flowline-charts, Or Perhaps BIM?
2016
Procedia Engineering
Four-dimensional Building Information Modelling is widely viewed as the next evolutionary step in construction scheduling. Linking scheduling information to parametric object models is believed to assist a more intuitive understanding of what is to be built when. We explore how 4D BIM, as a new method of visualization, compares to other pre-existing forms of visualization like bar-and flowline-charts. Based on a series of individual and focus group interviews, this paper reports construction
doi:10.1016/j.proeng.2016.11.658
fatcat:zzbsa45z7nb6dilbrlaicocg5i