Filters








1 Hit in 0.051 sec

ERPOT: A Quad-Criteria Scheduling Heuristic to Optimize Execution Time, Reliability, Power Consumption and Temperature in multicores

Athena Abdi, Alain Girault, Hamid Reza Zarandi
2019 IEEE Transactions on Parallel and Distributed Systems  
doi:10.1109/tpds.2019.2906172 fatcat:u3qsqrhc7rha3g5d7qcwtnny2u