Multicriteria verbal analysis for the decision of construction problems
2009
Technological and Economic Development of Economy
Contractors of international construction projects are often faced with complicated situations working in the conditions of uncertainty in construction. ...
One of the potential risk factors is associated with the requirements of contract conditions. ...
Therefore, the authors of the present paper illustrate the application of verbal analysis to the selection of the effective construction contract. ...
doi:10.3846/1392-8619.2009.15.326-340
fatcat:jjslo6mbsfgqdf52f35cwji4qe
Project risk assessment using the analytic hierarchy process
1991
IEEE transactions on engineering management
The paper also includes a review of the AHP and its application in the assessment of the riskiness of constructing the Jamuna Multipurpose Bridge in Bangladesh. ...
The analytic hierarchy process (AHP) is a new approach that can be used to analyze and assess project risks during the bidding stage of a construction project and to overcome the limitations of the traditional ...
Al-Bahar 0018-9391/91/0200-06$01.~ @ 1991 IEEE mation which is not normally available in the real construction world. 2) The applicability of such models to real construction risk analysis is limited. ...
doi:10.1109/17.65759
fatcat:t3otwfefhnaphch4q3ine2zks4
Study on Psychological Contract Based onPerformance Communication
2009
International Journal of Business and Management
Through deep analysis of the effect of performance communication on performance management and psychological contract, this article puts forward the psychological contract violation communication model ...
The verbal model is used in the developing of the ERM model. Current ERM models are re-interpreted and shaped according to the Turkish airport operators. ...
Acknowledgements The study is based on: Ayse Kucuk Yilmaz, Enterprise Risk Management Implementations and the Model Suggestion to the Airports in the Turkey, Doctoral Dissertation, Anadolu University, ...
doi:10.5539/ijbm.v3n7p150
fatcat:5v3gtopdgzchtjlarmwgehcgre
Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions
2020
Heliyon
The results of the confirmatory factor analysis showed that all risks were confirmed by the members of the research sample. ...
After reviewing the literature and the Project Management Body of Knowledge (PMBOK), 32 risk factors were identified and their number reduced to 17 risks using the expert opinions via the fuzzy Delphi ...
Unable to get guarantees from foreign companies on the contract Classification Based
on PMBOK
Risks
Time and Cost
Delays in delivery of drilling rig due to delay in construction of seler yards and ...
doi:10.1016/j.heliyon.2019.e03097
pmid:31922046
pmcid:PMC6948246
fatcat:ees3luvydnfa3fu62xnoz3w6km
The Evaluation of the Contractor's Risk in Implementing the Investment Projects in Construction by Using the Verbal Analysis Methods
2019
Sustainability
the contractor's risk in construction companies. ...
Therefore, the analysis of a number of qualitative and quantitative criteria of the projects and risks, as well as the potential profit-making opportunities in the investment decision making is required ...
Conflicts of Interest: The authors declare no conflict of interest. ...
doi:10.3390/su11092660
fatcat:fi5sctyhi5fm5k5jeeannucbj4
Periodizing Management's Risks of Construction Projects with Gray Relational Analysis and FMEA Approach
2020
IBIMA Business Review
made in the knowledge of risk management and project management. ...
Scientific research on risks of project management has little precedent and it lasted less than half a century from the first serious researches, but in the meantime, significant improvements have been ...
and
Table 4 : 4 Verbal expressions and gray numbers of risk factors assessment Occurrence
Severity
Detectability
Verbal
expression
Gray
number
Verbal
expression
Gray
number
Verbal ...
doi:10.5171/2020.799658
fatcat:erbkb3oznvgvnbllt4wp675q5m
The selection of contract strategies using the analytic network process for oil and gas projects: a case study
2019
Independent Journal of Management & Production
The key objective of this study was to select Oil & Gas projects contract strategies. The ANP method was used in order to achieve this objective. ...
A working group was formed to analyze the possible contract strategies for a particularly complex project and an ex post facto analysis was performed. ...
Lastly, Saaty's (1980) fundamental scale was also useful because the existing verbal correspondence was adequate to assess the elements involved in the contract strategy definition. ...
doi:10.14807/ijmp.v10i2.850
fatcat:lct37oetjbafhihh57q2jiqqv4
THE MULTICRITERIA ASSESSMENT OF THE SPATIAL PLANNING PROCESS: THE ASPECT OF INVESTMENT
2015
Journal of Civil Engineering and Management
The modified concept of the spatial planning model is suggested in accordance with the results obtained in the run of the carried out analysis. ...
For this purpose, the basic principles of spatial planning legislation have been analyzed. The challenge was addressed to the analysis of the verbal spatial planning system. ...
Andi (2006) identified and evaluated 27 construction risks. Hassanein and Afify (2007) found seven risk categories. Zou et al. (2007) ascertained 25 key risks in construction projects in China. ...
doi:10.3846/13923730.2015.1064469
fatcat:wz7kaetw7zb4xkhdzhujqucorm
THE ROLE OF INTERMEDIARIES' POWER ON CONTRACTING DECISION BETWEEN FARMERS AND INTERMEDIARIES
2019
New Medit
The paper investigates the determinants of farmers' participation in contract farming (CF) in the context of a transition country, namely Albania. ...
Other strong predictors of contracting decision are farmers' trust on the intermediary, intermediary's advice to the farmer and intermediary's specific investment. ...
Thus, as pointed out by Sorrentino et al. (2018) in bargaining power models one can account for contracting elements such as risk allocation, product quality, payment delays, inputs financing, provision ...
doi:10.30682/nm1903a
fatcat:so7dz2zkdfgaveejl5uqiia5ym
Visual analysis for conceptual design of complex systems
2018
International Journal of Design & Nature and Ecodynamics
Managing the development of complex organizational, technological, and socio-cultural systems calls for the construction of conceptual models that would define the properties and links between the elements ...
The authors propose the visual analysis method as a tool for the conceptual design of complex systems. ...
ACKNOWLEDGEMENTS The work was supported by Act 211 of the Government of the Russian Federation, contract No 02.A03.21.0006. ...
doi:10.2495/dne-v13-n2-166-175
fatcat:nwohthreqbcjvp6u6pi3oj7t44
Determining the essential skill requirements for construction managers' practice in Nigeria
2016
International Journal of Construction Supply Chain Management
Consequently efficient and effective management of future construction projects in Nigeria and other developing countries can be ensured. ...
These findings have seven practical implications to professional bodies, Universities and other trainers of construction managers, whose present curricula may be deficient in knowledge areas in industry ...
contracting strategies (MS=4.73) and verbal communication (MS=4.55).
58
Exploratory Factor Analysis of Skill Requirements of Construction Managers The inferential results for testing the above hypothesis ...
doi:10.14424/ijcscm602016-48-63
fatcat:vedgyceronf73huoautt35dd5e
SIMULATION OF HYDRATION AND CRACKING PROPAGATION WITH TEMPERATURE EFFECT BAWSED ON FUZZY LOGIC THEORY
2011
Mechanics
Acknowledgement This work was supported by the Czech Science Foundation, project 103/08/1372, and by the Ministry of Education, Youth and Sports of the Czech Republic, project MSM6840770003, which are ...
The finite elements used in the thermal analysis are the bi-linear isoparametric quadrilateral elements. ...
Third routine -risk of cracking The risk of possible cracking of early-age concrete considers the stresses caused by thermal expansion and subsequent contraction and shrinkage. ...
doi:10.5755/j01.mech.17.4.561
fatcat:hvucu4pipfaaxmfttfqz5ja76u
TO THE FAITHFUL DECLASSED: HEALTH RISK AS SPECIESIST CAMOUFLAGE
2017
RESEARCH RESULT Theoretical and Applied Linguistics
in the verbal material together with the elements systematized by Kress and van Leeuwen [1996] for image analysis and Ekman [2003] and Kendon [2004] for gestural analysis. ...
In this case, they seem to be a risk because they are alive. The present work aims to analyze the construction of speciesist representations in graphic press speaking about homeless dogs. ...
They will be constructed as passive objects, with no possibility of choice or action, unless they are considered a health risk. 6. ANALYSIS 6.1. ...
doi:10.18413/2313-8912-2017-3-2-25-35
fatcat:m4nwm7rc7ffqppzwshdsdav7gu
ENHANCEMENT OF BID DECISION-MAKING IN CONSTRUCTION PROJECTS: A RELIABILITY ANALYSIS APPROACH
2021
Journal of Civil Engineering and Management
Estimating the probability of project failure enables estimators to quantify the risk element of bid price. ...
So too, the proposed method offers a blueprint for estimating and calculating time and contingency – and managing associated risks – in planning construction projects. ...
In the case where the client is found to be reputable with a low probability of cost overrun, contractors are more flexible to lower the risk element of markup with more confident. ...
doi:10.3846/jcem.2021.14344
fatcat:k5g2l27mzrgqhkwowoqrsqta3u
Impacts of Risk Allocation on Contractors' Opportunistic Behavior: The Moderating Effect of Trust and Control
2020
Sustainability
In this study, a structural equation model was built to explore the impacts of risk allocation on opportunistic behavior and the moderating role of trust and control through an empirical test using a recovery ...
This study enriches the research on the governance mechanism and construction management of opportunistic behaviors and provides management suggestions for risk allocation and control measures of such ...
Conflicts of Interest: The authors declare no conflict of interest. ...