A copy of this work was available on the public web and has been preserved in the Wayback Machine. The capture dates from 2017; you can also visit the original URL.
The file type is application/pdf
.
Filters
Through Life Capability Management perspective for framework development for assessing and measuring System Maturity, System Readiness and Capability Readiness using Architecture Frameworks
2010
2010 5th International Conference on System of Systems Engineering
This study investigates the use of Through Life Capability Management perspective for refinement of the Conceptual Framework for Assessing and Measuring System Maturity, System Readiness and Capability ...
Readiness using Architecture Frameworks. ...
ACKNOWLEDGMENTS The author would like to thank the UK Engineering and Physical Sciences Research Council (EPSRC) and BAE Systems for jointly funding the research project. ...
doi:10.1109/sysose.2010.5544044
dblp:conf/sysose/Tetlay10
fatcat:quog5dvrvfbsbb4vhri27r5o64
Maturity Models and Tools for Enabling Smart Manufacturing Systems: Comparison and Reflections for Future Developments
[chapter]
2017
IFIP Advances in Information and Communication Technology
capability, maturity and readiness level to implement Smart Manufacturing. ...
Therefore, based on their comparison, the ultimate purpose of the research is to come up with a set of coherent guidelines for assessing a manufacturing system and its management practices, for identifying ...
, PLM for product life cycle management, and MES for manufacturing execution system. ...
doi:10.1007/978-3-319-72905-3_3
fatcat:wgywpomv4fd35m53amegw4722m
A Performance-Based System Maturity Assessment Framework
2013
Procedia Computer Science
The lack of system-level maturity has led to the development of many processes and methods for documenting, assessing, and resolving maturity and readiness. ...
A logical assignment of relevant metrics by program phase will be made based on specific criteria. using various readiness/ maturity models and metrics to map from system development state to desired measures ...
To clarify the use of some terms in the work, the following definitions for framework, readiness and maturity are offered. ...
doi:10.1016/j.procs.2013.01.072
fatcat:fve5vrso7fashbhqalm65bzwce
Scenario-based design and evaluation for capability
2010
2010 5th International Conference on System of Systems Engineering
ACKNOWLEDGMENT The work reported in this paper has been supported by the NECTISE program, which was jointly funded by BAE Systems and the UK Engineering and Physical Sciences Research Council Grant EP/ ...
Section III outlines a scenario-based architectural evaluation framework for the evaluation of candidate architectures and how scenarios can be used to develop a set of measures. ...
The programme had a wide scope that included research into high-level architectural approaches, through-life systems management and design decision making, through to specific technological approaches ...
doi:10.1109/sysose.2010.5544073
dblp:conf/sysose/UrwinVRLLWHX10
fatcat:faxu2hnh3fc7bpful55bnw2piu
Towards a Platform for Smart Manufacturing Improvement Planning
[chapter]
2018
IFIP Advances in Information and Communication Technology
Several smart manufacturing capability assessment and maturity models exist to guide the transition. However, support for choosing the right one is lacking. ...
The platform allows for risk-free self-assessments of the current maturity levels and developments of continuous improvement plans that are customized to the manufacturers' unique characteristics. ...
Related Works Over the past decade, frameworks or models for business and process maturity assessment have been developed within the manufacturing sector. ...
doi:10.1007/978-3-319-99707-0_47
fatcat:gxtdgtt2nzeqlckrxijngagqua
The framework for assessing company's digital transformation readiness
2020
St Petersburg University Journal of Economic Studies
that takes into account not only the current state of the company, but also its previous development. e paper formulates the requirements for the readiness assessment system in the form of a framework ...
As a result of applying the proposed method a framework for a company's readiness for digital transformation assessment (DTRA) is created. e DTRA framework includes criteria and characteristics of readiness ...
life cycle management system has been implemented; -production planning and monitoring systems have been deployed. ...
doi:10.21638/spbu05.2020.204
fatcat:rbqelixihrcq3morqsopa3w7te
System Readiness Assessment (SRA) an Illustrative Example
2015
Procedia Computer Science
This paper describes in detail and provides an illustrative example of a Systems Readiness Assessment (SRA) Engineering Process. ...
The intended users include Program Managers, Lead Systems Engineers (LSEs), Systems Engineers, Independent Review Teams (IRTs), and developers. ...
During large-scale developments, it is also critical to measure the system readiness at multiple points along the life cycle to avoid pitfalls that can occur when readiness is only assessed once or twice ...
doi:10.1016/j.procs.2015.03.031
fatcat:ily4usrrkjaljlr4t3jj73qhai
Towards project management maturity: The case of the South African government
2020
Africa's Public Service Delivery & Performance Review
South African Public Service, to determine the organisational readiness and overall project maturity of national government departments.Setting: The study focused on project maturity assessments in government ...
An overarching model and uniform methodology for project management are largely absent.Conclusion: International standards and best practices should be adopted and adapted for the unique nature of governance ...
Funding information This research received no specific grant from any funding agency in the public, commercial or not-for-profit sector. ...
doi:10.4102/apsdpr.v8i1.407
fatcat:7z2kk3er2nb2piixbyj2zsu4uy
Development of an Organizational Maturity Model in Terms of Mass Customization
[chapter]
2020
Industry 4.0 for SMEs
Proposed Capability
Maturity Model aims
to evaluate the matu-
rity and readiness of
manufacturing enter-
prises from the factory
operations perspective
using 5 levels
Operation technology ...
(s) of interest
Katsma et al. (2011)
CP
I4.0 readiness MM
and architectural
framework
It contains four stages
that describe the
development from ERP
to the IoT. ...
doi:10.1007/978-3-030-25425-4_8
fatcat:urlqqjvxynfwhkj7zrsvjuv4mq
Building Information Modelling (BIM) Adoption Model for Architectural Education
2020
Journal of Design and the Built Environment
for readiness assessment, roadmap development, and exchange terminologies between education and the wider context of architecture, engineering, construction, operation and management industries. ...
, and (f) change management. ...
The system also includes the capabilities of life-cycle costing, environmental analysis, energy use, auditing of models, management of life-cycle information through facility management systems, and self-reporting ...
doi:10.22452/jdbe.vol20no3.2
fatcat:7b5jam6axvdwhka2svpnr5ugpu
MEASURING THE IMPACT OF ENTERPRISE ARCHITECTURE
2007
Issues in Information Systems
Enterprise architecture frameworks provide a basis to systematically document and manage the information technology assets of an organization. ...
Further, it extends enterprise architecture research by providing a theoretical model to assess the fit of enterprise architecture frameworks. ...
, workstations, networking and management, and 4) identifying the dominant strategic perspective from the Strategic Alignment Model and use the methods defined for that perspective as an implementation ...
doi:10.48009/2_iis_2007_437-442
fatcat:t4lwxelvnvc6pdbcfvd3s3flxq
A Framework for Industry 4.0 Readiness and Maturity of Smart Manufacturing Enterprises: A Case Study
2021
Sustainability
Recently, researchers have proposed various maturity models (MMs) for assessing Industry 4.0 (I4.0) adoption; however, few have proposed a readiness framework (F/W) integrated with technology forecasting ...
(TF) to evaluate the growth of I4.0 adoption and consequently provide a roadmap for the implementation of I4.0 for smart manufacturing enterprises. ...
MEDITERRANEAN UNIVERSITY (protocol code: ETK00-2020-0220 and date of approval: October 30, 2020). ...
doi:10.3390/su13126659
fatcat:xxlmdb5cprdopow2vgarf6rss4
An obsolescence management framework for system baseline evolution-Perspectives through the system life cycle
2009
Systems Engineering
Additionally, each of the obsolescence management framework components is analyzed for life cycle phase applicability and then extended further with the criticality and type of analysis to be done for ...
In military, civil, and commercial systems there exists a need to affordably manage the operational effectiveness of the system of interest through the acquisition and operational stages of its life cycle ...
TPS&HA monitors the ongoing product roadmaps and maturity assessment data to formulate useful decision information for the systems engineer. 6. ...
doi:10.1002/sys.20106
fatcat:h4zptqkg7nawjclmfta2efs76m
Green IT Readiness: A Framework and Preliminary Proof of Concept
2010
Australasian Journal of Information Systems
This paper identifies five main areas of Green IT capability and describes the main pillars of a G-readiness framework to help organisations evaluate their maturity for Green IT. ...
The utility of the framework is demonstrated through a desk-based research case study of four organisations. ...
Three value chain areas can assess the extent of policy readiness -IT sourcing, IT operations and services and IT end-of-life management. POLICY
). ...
doi:10.3127/ajis.v16i2.545
fatcat:oekkwxixxrdvnoahi2t3n6w2ci
System Development Planning via System Maturity Optimization
2009
IEEE transactions on engineering management
through a system development life cycle. ...
This paper proposes a system-focused approach for managing system development and making effective and efficient decisions during this life cycle. ...
To understand developmental maturity, a framework for describing the maturity of a system comparative to its life cycle is needed. As discussed, Sauser et al. ...
doi:10.1109/tem.2009.2013830
fatcat:2kielseqlvgfbg5jtu6jvvedaa
« Previous
Showing results 1 — 15 out of 16,746 results