Filters








683 Hits in 7.5 sec

Mixed Integer Programming Approaches to Planning and Scheduling in Electronics Supply Chains

Tadeusz Sawik
2017 Decision Making in Manufacturing and Services  
The paper also highlights the research on stochastic MIP applications to the planning and scheduling in electronics supply chains with disrupted material and information flows due to natural or man-made  ...  Then, the medium-term aggregate production planning in a production/assembly facility of a consumer electronics supply chain is described; and finally, the coordinated aggregate planning and scheduling  ...  ACKNOWLEDGEMENTS This work has been supported by NCN research grant #DEC-2013/11/B/ST8/04458, and by AGH #11.11.200.324.  ... 
doi:10.7494/dmms.2017.11.1-2.5 fatcat:zrhfkb2aerbvlcofeoe4bhdihy

BÜTÜNLEŞİK TEDARİK ZİNCİRİ ÇİZELGELEME MODELLERİ: BİR LİTERATÜR TARAMASI

Zeynep CEYLAN, Serol BULKAN, Hakan TOZAN
2019 Mühendislik Bilimleri ve Tasarım Dergisi  
In this study, existing literature on ISCS problems are reviewed and summarized by introducing the new classification scheme.  ...  Scheduling, Supply chain, Supply chain scheduling. Research on integration of supply chain and scheduling is relatively recent, and number of studies on this topic is increasing.  ...  of flow shop machines (regular flow shop, no-wait flow shop, flexible flow shop, assembly flow shop), jobshops and others.  ... 
doi:10.21923/jesd.414551 fatcat:4yppdm6w2bhzzfy5bxcrwaoehq

An integrated production scheduling and delivery route planning with multi-purpose machines: A case study from a furniture manufacturing company

S. Mohammadi, S.M.J. Mirzapour Al-e-Hashem, Y. Rekik
2019 International Journal of Production Economics  
Our framework is modeled as a novel bi-objective mixed integer problem, in which the first objective function aims to minimize a sum of the production and distribution scheduling costs, and the second  ...  Hence, in this study, we address an integrated production scheduling-vehicle routing problem with a time window, where it is assumed that production is performed in a flexible job-shop system.  ...  Thus, our model could be adapted to solve other production and/or distribution systems with simpler machine (such as flow-shop) and/or delivery configurations (such as split delivery).  ... 
doi:10.1016/j.ijpe.2019.05.017 fatcat:el7t2idlpfc7nnqx5srmi52zqe

A survey of case studies in production scheduling: Analysis and perspectives

Helio Yochihiro Fuchigami, Socorro Rangel
2018 Journal of Computational Science  
The problems of production scheduling and sequencing refer to decision making regarding the designation of jobs to available resources and their subsequent order to optimize pre-defined performance measures  ...  This survey aims to highlight practical research and case studies published in the literature in the scheduling area, identifying the main characteristics of the problems treated, trends in this research  ...  The authors are also grateful to the organizing committee of the COMPSE 2016 conference and to the anonymous referees whose comments were important to enhance the paper quality and readability.  ... 
doi:10.1016/j.jocs.2017.06.004 fatcat:esjzovlebbembdh4rqln3ugbw4

A two-stage stochastic supply chain scheduling problem with production in cellular manufacturing environment: A case study

Bahman Esmailnezhad, Mohammad Saidi-Mehrabad
2021 Scientia Iranica. International Journal of Science and Technology  
The supply chain scheduling along with the production approach of cellular manufacturing under demand, processing time, and transportation time uncertainties makes business environment sustainably responsive  ...  Numerous test problems are employed to validate the effectiveness of the modeling and the efficiency of solution approaches.  ...  Manufacturers have changed their traditional configuration like job shop and flow shop to new one such as the CM. the CM utilizes the positive features of job shop that is flexibility and variety, and  ... 
doi:10.24200/sci.2021.53506.3277 fatcat:w2kunzgcjrhkjldvfssjnvwrxm

An effective hybrid multi-objective genetic algorithm for bi-criteria scheduling on a single batch processing machine with non-identical job sizes

Ali Husseinzadeh Kashan, Behrooz Karimi, Fariborz Jolai
2010 Engineering applications of artificial intelligence  
The efficiency of the proposed BOGA is evaluated to be compared with many test problems by -constraint method based on performance measures.  ...  This paper considers the problem of minimizing make-span and maximum tardiness simultaneously for scheduling jobs under non-identical job sizes, dynamic job arrivals, incompatible job families, and sequence-dependent  ...  Moreover, extension of the proposed model to the case of scheduling other shop systems, e.g., flow shop and parallel batch processing machines are encouraged.  ... 
doi:10.1016/j.engappai.2010.01.031 fatcat:ib6d75pp65cqheu5isz37vv52i

A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain

S.H. Zegordi, I.N. Kamal Abadi, M.A. Beheshti Nia
2010 Computers & industrial engineering  
Machine scheduling with job delivery coordination. European Journal of Operational Research, 158(2), 470-487].  ...  In addition, we compare the GGA performance with that of the most similar problem reported to date in the literature as proposed by Chang and Lee [Chang, Y., & Lee, C. (2004) .  ...  In a recent study, Mazdeh, Sarhadi, and Hindi (2008) use a branch-and-bound algorithm to minimize the sum of flow times and delivery costs in the context of a single machine, considering a batch delivery  ... 
doi:10.1016/j.cie.2009.06.012 fatcat:qoyaqj7b65bv3ozcjsgv2k4rhi

Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies

M. F. Anwar, R. Nagi
1998 International Journal of Production Research  
, and to reduce material handling and inventory holding costs on the shop-floor.  ...  The performance of the proposed heuristic is evaluated via extensive numerical studies and compared with the traditional sequential scheduling approach.  ...  In a flow-shop environment, the scheduling problem is comparatively simpler than that of a job-shop and assembly environment.  ... 
doi:10.1080/002075498193624 fatcat:7wczvrl5dzg7xjpipbf6zmad7m

Mixed Model Assembly Line Scheduling Approach to Order Picking Problem in Online Supermarkets

Minfang Huang, Qiong Guo, Jing Liu, Xiaoxu Huang
2018 Sustainability  
With an objective of minimizing the picking and packaging time, this paper studies order batching and order sequencing.  ...  This paper focuses on scheduling the three processes of order picking problems in a warehouse for an online supermarket.  ...  Conflicts of Interest: The authors declare no conflict of interest.  ... 
doi:10.3390/su10113931 fatcat:2lzmn35p6vhl3lndedl3shu3qu

TECHNIQUES AND APPLICATIONS OF PRODUCTION PLANNING IN ELECTRONICS MANUFACTURING SYSTEMS [chapter]

JOUNI SMED, MIKA JOHNSSON, TOMMI JOHTELA, OLLI NEVALAINEN
2003 Computer Aided and Integrated Manufacturing Systems  
Our intention is to identify the typical problems arising from production planning and to give a survey of the solution methods suggested in the literature.  ...  Electronic systems are usually implemented with printed circuit boards (PCBs), and, consequently, PCB assembly has become an important sector of the electronics manufacturing industry overall.  ...  [32] convert the scheduling problem of flexible assembly lines to a flow line scheduling problem.  ... 
doi:10.1142/9789812796813_0001 fatcat:ddkdmju5gna5rpsdjnvdyahvam

A Literature Review of Energy Efficiency and Sustainability in Manufacturing Systems

Paolo Renna, Sergio Materi
2021 Applied Sciences  
The works are grouped together, considering the system typology, i.e., manufacturing system subclasses (single machine, flow shop, job shop, etc.) or the assembly line, the developed energy-saving policies  ...  and the implementation of the renewable energy sources in the studied contexts.  ...  Conflicts of Interest: The authors declare no conflict of interest.  ... 
doi:10.3390/app11167366 fatcat:utvylqdpdbgdppmdkiqcjyi57y

Decision support for build-to-order supply chain management through multiobjective optimization

S. Afshin Mansouri, David Gallear, Mohammad H. Askariazad
2012 International Journal of Production Economics  
The gap between the modelling and optimization techniques developed in the literature and the decision support needed in practice are highlighted.  ...  To this end, it reviews the literature available on modelling build-toorder supply chains (BTO-SC) with the focus on adopting MOO techniques as a decision support tool.  ...  Acknowledgment This research was supported in part by Brunel Research Initiative and Enterprise Fund (BRIEF) under award no. 870.  ... 
doi:10.1016/j.ijpe.2010.11.016 fatcat:qervr6n33ngtrjawbnpdqamebe

Coordination of production and transportation in supply chain scheduling

Shanlin Yang, Wenjuan Fan, Xinbao Liu, Panos M. Pardalos, Jun Pei, Ling Wang
2014 Journal of Industrial and Management Optimization  
In the second stage, a single vehicle transports jobs between the two factories. In our research, both setup time and capacity constraints are explicitly considered.  ...  Particularly, the first and the third stages involve two factories, i.e., the extrusion factory of the supplier and the aging factory of the manufacturer, where serial batching machine and parallel batching  ...  We would like to thank the editors and referees for their valuable comments and suggestions.  ... 
doi:10.3934/jimo.2015.11.399 fatcat:7fpqacarkrcjllqgmxbd5ectqm

Research on Machining Workshop Batch Scheduling Incorporating the Completion Time and Non-Processing Energy Consumption Considering Product Structure

Nailiang Li, Caihong Feng
2021 Energies  
The process sequence of parts and components should be consistent with the assembly sequence.  ...  A bi-objective batch scheduling model that minimizes the total energy consumption and the total completion time is developed, and the multi-objective gray wolf optimizer (MOGWO) is employed as the solution  ...  However, the scheduling research on multi-level structure products is not enough to solve the problem of collaboration production because sequence constraint scheduling should be compatible with the assembly  ... 
doi:10.3390/en14196079 fatcat:khuikur4yzfbzbyxj2u5hipez4

Digital enterprise solution for integrated production planning and control

L. Monostori, G. Erdős, B. Kádár, T. Kis, A. Kovács, A. Pfeiffer, J. Váncza
2010 Computers in industry (Print)  
The paper introduces a novel approach for integrated production planning and control, with the description of the mathematical models and solution algorithms.  ...  Digital enterprise technologies combined with sophisticated optimization algorithms can significantly contribute to the efficiency of production.  ...  This research has been supported by the Hungarian Scientific Research Fund (OTKA) grants "New mathematical models and methods for integrated production planning and scheduling" K-76810, and "Production  ... 
doi:10.1016/j.compind.2009.10.008 fatcat:dm5xf2wdd5cxzetpe2uditgqte
« Previous Showing results 1 — 15 out of 683 results