Filters








3,747 Hits in 4.4 sec

FUSION: A Tool for Facilitating and Augmenting Android Bug Reporting [article]

Kevin Moran, Mario Linares-Vasquez, Carlos Bernal-Cardenas, Denys Poshyvanyk
2018 arXiv   pre-print
In this demo we present the implementation of a novel bug reporting system, called Fusion, that facilitates users including reproduction steps in bug reports for mobile apps.  ...  Results of preliminary studies demonstrate that Fusion both effectively facilitates reporting and allows for more reliable reproduction of bugs from reports compared to traditional issue tracking systems  ...  to the database for a developer to view later (see Figure 4 for an example report).  ... 
arXiv:1801.05940v1 fatcat:sndzpq6a6fapnfd6aro646za7m

A proposed Framework for Integrating XBRL and Blockchain to Improve Financial Reporting Transparency and Integrity: XBRL Chain

Asmaa Serag
2022 المجلة العلمیة للدراسات والبحوث المالیة والتجاریة  
The proposed framework of XBRL chain makes the quality of information in the financial reporting more interoperability and comparability.  ...  The case explained how the integration between XBRL and blockchain can be built to implement XBRL mapping for consolidated balance sheet and profit or loss statement the mapping process is implemented  ...  The first at which the misfit of taxonomy affects financial reporting comparability and the user view is the problem of extracting the financial.  ... 
doi:10.21608/cfdj.2021.207395 fatcat:nkzm2art6jccdcwgsdld4e6ofm

Enabling technologies requirements and specification report

Johannes Stöckl, Gerhard Jambrich, Marcus Milnera, Judith Kapeller, Nina Fuchs, Paul Smith, Heinrich Humer, Elisabeth Mrakotsky-Kom, Tommaso Bragatto, Massimo Cresta, Stefan Costea, Franceso Bellesini (+4 others)
2021 Zenodo  
This report provides insight in the planned enabling solutions to be developed within HYPERRIDE project.  ...  The descriptions and general specifications outlined here have to be read in context with: D2.1: Requirements on grid infrastructure - describing systemic requirements for DC and hybrid Alternating Current  ...  The Deliverable of T3.2 is a demo version of the online Component Sizing Tool, with an additional report explaining the calculations and simulations in the background.  ... 
doi:10.5281/zenodo.4772129 fatcat:phbkonox5ve65jyyuwxazsijri

The 4th workshop on active internet measurements (AIMS-4) report

kc claffy
2012 Computer communication review  
This report briefly describes topics discussed at this year's workshop. Slides and other materials related to the workshop are available at [1].  ...  We thank all participants for their insights, and many thanks to Evi Nemeth for taking excellent notes at the meeting.  ...  BBN and CAIDA have had some follow-up discussion related to smart scanning for IPv6 3.  ... 
doi:10.1145/2317307.2317315 fatcat:s6o65nye7rahfh5hjsv6cueoja

AAAI 2008 Workshop Reports

Sarabjot Singh Anand, Razvan C. Bunescu, Vitor R. Carvalho, Jan Chomicki, Vincent Conitzer, Michael T. Cox, Virginia Dignum, Zachary Dodds, Mark Dredze, David Furcy, Evgeniy Gabrilovich, Mehmet H. Göker (+25 others)
2009 The AI Magazine  
Solvers; AI Education Workshop Colloquium; Coordination, Organizations, Institutions, and Norms in Agent Systems, Enhanced Messaging; Human Implications of Human-Robot Interaction; Intelligent Techniques for  ...  Thinking; Multidisciplinary Workshop on Advances in Preference Handling; Search in Artificial Intelligence and Robotics; Spatial and Temporal Reasoning; Trading Agent Design and Analysis; Transfer Learning for  ...  In that time, the HCI community has explored the effect of e-mail overload and tools for combating the problem.  ... 
doi:10.1609/aimag.v30i1.2196 fatcat:xsrhlc3tgzhzphg3wt57klqvqu

Third Periodic Report

Gabor Kitley
2013 Zenodo  
The Geothermal Communities project, joint action of 16 individual partners, demonstrates the best available technologies for the use of geothermal energy combined with innovative energy efficiency measures  ...  Mario Dionisio) For most of the projects, the signature of this declaration could be done directly via the IT reporting tool through an adapted IT mechanism.  ...  (which replaced the old GA) rendered all the reported DEMO actions of the first two project years ineligible.  ... 
doi:10.5281/zenodo.1291391 fatcat:oi6uoxeqcjhjlcbgoasst26r5u

Eyewear Computing – Augmenting the Human with Head-mounted Wearable Assistants (Dagstuhl Seminar 16042)

Andreas Bulling, Ozan Cakmakci, Kai Kunze, James M. Rehg, Marc Herbstritt
2016 Dagstuhl Reports  
gaming, as well as prototyping of VR applications, 2) a list of datasets and research tools for eyewear computing, 3) three small-scale datasets recorded during the seminar, 4) an article in ACM Interactions  ...  In contrast to several previous Dagstuhl seminars, we used an ignite talk format to reduce the time of talks to one half-day and to leave the rest of the week for hands-on sessions, group work, general  ...  Authoring of applications for smart glasses, in particular for training, is a big issue that comes with its own problems. Measuring user interactions.  ... 
doi:10.4230/dagrep.6.1.160 dblp:journals/dagstuhl-reports/BullingCKR16 fatcat:d3p4lmvat5aczhawlazkd2chpa

D5.2 - Report On System Integration And Application Implementation

Gerhard Dünnebeil, Mario Drobics, Karl Kreiner, Ivan Gojmerac, Refiz Duro, Joao Garcia, Raquel Ventura Miravet, Matteo Pardi, Reinhard Herzog, Vasilis Glykantzis, Juan Belmonte Rodriguez, Antonio Paradell Bondia (+5 others)
2017 Zenodo  
This deliverable reports on the current integrated software and documents the designed applications to be used in the trials.  ...  berth through sensors There should not be any need for the yachtsman to physically go to the Port Authority, unless problems are detected and reported.  ...  This will allow for a unified view on various platforms and their resources.  ... 
doi:10.5281/zenodo.858836 fatcat:y37mgpj6pvbrtkxidz4d3nkjqm

Deliverable D3.7 Consolidated Projects Summary Report

Alasdair Reid, Matias Barberis Rami
2021 Zenodo  
This report presents key figures at project level and results achieved at third-party funded project level.  ...  This report is part of a project that has received funding from the European Union's Horizon 2020 research and innovation programme under grant agreement No.825618  ...  The most significant "metadata multiplicity problem" was documented in a dedicated document on the project website. • Public metadata workshop, including demo of developed functionality.  ... 
doi:10.5281/zenodo.5767430 fatcat:w2lxzgxktretjcv7h4xotz7xaq

D1.3 –Interim project report

Luís Sousa, André Fernandes
2021 Zenodo  
This deliverable represents the Interim Progress Report for the ENSURESEC project,and it summarises the progress of the project during the first year of execution.  ...  It outlines the degree of achievement of project objectives and the work carried out towards it, the status of the project in terms of reporting and delivery,the updated risk register,as well as the progress  ...  demo session for demonstrating the initial prototypes of WP4 tools to the whole consortium, at M12.  ... 
doi:10.5281/zenodo.5598989 fatcat:pp2wgw6pmnaebp6gne2v53b5mi

Fusion Simulation Project Workshop Report

Arnold Kritz, David Keyes
2008 Journal of fusion energy  
The report outlines technical challenges and a plan for approaching the project including iii the project structure and management.  ...  The Fusion Simulation Project outlined in this report is an ideal vehicle for collaboration between the OFES and OASCR because it embodies the ten-year plans of both organizations, and magnetically confined  ...  To meet the programmatic goals outlined above, a critical set of scientific problems must be addressed. These issues provide an organizing principle for the rest of this report.  ... 
doi:10.1007/s10894-008-9151-4 fatcat:mgibgmcdand75ptldzeeekwdwm

Project Periodic Report n°1 - D1.2 INVADE H2020

Dieter Hirdes
2018 Zenodo  
The work carried out during the first reporting period towards the achievement of each objective is explained in this document.  ...  deliver a Cloud-based flexibility management system integrated with EVs and batteries empowering energy storage at mobile, distributed and centralised levels to increase the share of renewables in the smart  ...  Deliverable D1.2 -Project Periodic Report n°1 Page 25 of 50 2 Battery techno-economics tool. • T6.4 Battery safety and lifecycle management Deliverable D1.2 -Project Periodic Report n°1 Page 27  ... 
doi:10.5281/zenodo.3626817 fatcat:nzq3d363jbfyngbllssgbecy3u

D1.2 - Initial Report On System Requirements And Architecture

Pavle Skocir, Ivana Podnar Zarko, Konstantinos Katsaros, Mario Kusek, Elena Garrido Ostermann, Matteo Pardi, Joao Garcia, Aleksandar Antonic, Zvonimir Zelenika, Artur Jaworski, Michal Pilc, Christoph Ruggenthaler (+1 others)
2016 Zenodo  
The document also reports an initial view on components and envisioned functionality needed for the Smart Space and Smart Device domain.  ...  Within symbIoTe project, the nAssist platform will be used in Smart Space Domain for the practical deployment of demos, pilots and trials in the context of the Smart Homes services, and in the creation  ...  Within symbIoTe, Symphony will aim to achieve Level-3 Compliance, thus enabling creation of dynamic smart spaces.  ... 
doi:10.5281/zenodo.817464 fatcat:t2rskodexvfxfgvc2e5mhl44mm

Deliverable 5.3: Report on trainings

Alice Sheppard, Abril Herrera, Muki Haklay
2022 Zenodo  
We also report how we built on our earlier work identifying specific training gaps in the field of CS, using a survey and a workshop to select the topics of the modules and widening the scope of topics  ...  The vision for the EU-Citizen.Science platform is to aid in the mainstreaming of citizen science, by building a sustainable platform as a learning space for citizen science in Europe for researchers, citizen  ...  The information, documentation and figures in this training module are written by the EU-Citizen.Science project consortium under EC grant agreement No. 824580 and do not necessarily reflect the views  ... 
doi:10.5281/zenodo.5820262 fatcat:pvv74jommjhgzprqysw6gemm5e

D4.4 - Technical Report on Second Pilot

Mario Montagud, Pablo Cesar
2019 Zenodo  
The document reports the work of the project on user experience.  ...  5.3.2.10 Thank you for feedback!  ...  A general inductive approach for analyzing qualitative evaluation data.  ... 
doi:10.5281/zenodo.4531455 fatcat:gcvjqvlgwjflbaupag6lc7blrq
« Previous Showing results 1 — 15 out of 3,747 results