Minimizing total flow time in the single-machine scheduling problem with periodic maintenance
2006
Journal of the Operational Research Society
Single machine flow-time scheduling with scheduled maintenance. Acta Inform 29: 375-382.
Lee CY and Lin CS (2001). Single-machine scheduling with maintenance and repair rate-modifying activities. ...
Single-machine scheduling with periodic maintenance and nonresumable jobs. Comput Open Res 30: 1335-1347.
Qi X, Chen T and Tu F (1999). Scheduling the maintenance on a single machine. ...
doi:10.1057/palgrave.jors.2601998
fatcat:kgiwn5q6znbexnkrkcxsbv6za4
Minimizing total flow time in the single-machine scheduling problem with periodic maintenance
2012
Journal of the Operational Research Society
Minimizing total flow time in the singlemachine scheduling problem with periodic maintenance. J Opl Res Soc.
WJ Chen China University of Technology (Taiwan) for details. ...
According to Step 1(ii), we then have another batch with a total processing time of TÀ4 ¼ 4. ...
doi:10.1057/jors.2011.71
fatcat:hemfex3whnbebpufp3udc6xyui
An effective heuristic for flexible job-shop scheduling problem with maintenance activities
2010
Computers & industrial engineering
In this paper, a flexible job-shop scheduling problem with machine availability constraints is considered. ...
Each machine is subject to preventive maintenance during the planning period and the starting times of maintenance activities are either flexible in a time window or fixed beforehand. ...
Firstly, most existing literature focus on the problem of integrating production scheduling with preventive maintenance activities in the context of single machine, parallel machine and flow shop (especially ...
doi:10.1016/j.cie.2010.05.016
fatcat:2bfx2nc43rawfplfiqbezr5nei
Page 703 of The Journal of the Operational Research Society Vol. 57, Issue 6
[page]
2006
The Journal of the Operational Research Society
with the problem of scheduling a single machine with periodic maintenance, where the machine is assumed to be stopped periodically to be maintained or to be reset for a constant time w during the scheduling ...
constraints; single machine
Introduction
In the classical problem of scheduling jobs on a single machine to minimize the mean flow time, the assumption has always been that the machine is continuously ...
Page 415 of The Journal of the Operational Research Society Vol. 57, Issue 4
[page]
2006
The Journal of the Operational Research Society
Single machine flow-time scheduling with scheduled maintenance. Acta Inform 29: 375-382.
Lee CY and Lin CS (2001). Single-machine scheduling with maintenance and repair rate-modifying activities. ...
Single-machine scheduling with periodic maintenance and nonresumable jobs. Comput Open Res 30: 1335-1347.
Qi X, Chen T and Tu F (1999). Scheduling the maintenance on a single machine. ...
Single-machine scheduling with flexible and periodic maintenance
2006
Journal of the Operational Research Society
Machine scheduling with a rate- modifying activity. Eur J Opl Res 128: 119-128.
Lee CY and Liman SD (1992). Single machine flow-time scheduting with scheduled maintenance. Acta Inform 29: 375-382. ...
with the problem of scheduling a single machine with periodic maintenance, where the machine is assumed to be stopped periodically to be maintained or to be reset for a constant time w during the scheduling ...
doi:10.1057/palgrave.jors.2602043
fatcat:3r5jbsfrvbbdhjvklvhsazrv7y
Scheduling with Time-Dependent Processing Times 2015
2015
Mathematical Problems in Engineering
Qi et al. investigate a scheduling problem on a single machine with a maintenance, in which the starting time of the maintenance is given in advance but its duration depends on the load of the machine ...
Xu consider a maximum lateness minimization scheduling problem on a single machine with a mandatory maintenance whose duration is workload dependent. ...
Qi et al. investigate a scheduling problem on a single machine with a maintenance, in which the starting time of the maintenance is given in advance but its duration depends on the load of the machine ...
doi:10.1155/2015/367585
fatcat:2yaa56w5pzgqpmrloauxzw4wja
A Pareto-Optimal Solution for a Multi-Objective Scheduling Problem with Periodic Maintenance Requirement
2012
International Journal of Operations Research and Information Systems
The objective of the model addressed is to minimize the weighted function of the total job flow time, the maximum tardiness, and the machine idle time in a single machine problem with periodic maintenance ...
A Pareto-optimal solution is developed in this paper for a scheduling problem on a single machine with periodic maintenance and non-preemptive jobs. ...
More studies have been done recently in single-machine scheduling problem incorporating with maintenance schedule. ...
doi:10.4018/joris.2012040102
fatcat:4goq43guovhdhhlujorujdcm3u
Page 663 of Mathematical Reviews Vol. , Issue 2004a
[page]
2004
Mathematical Reviews
Summary: “We study a single-machine scheduling problem where periodic maintenance is required in a complete schedule. ...
|Chen, Wen-Jinn]
Single-machine scheduling with periodic maintenance and nonresumable jobs. (English summary)
Comput. Oper. Res. 30 (2003), no. 9, 1335-1347. ...
737 BAKIM FAALİYETLERİNİ DİKKATE ALAN MAKİNE ÇİZELGELEME: LİTERATÜR ARAŞTIRMASI
2021
Uludağ University Journal of The Faculty of Engineering
The purpose of this study is to analyze machine scheduling studies together with maintenance activities. ...
A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities, A modified particle swarm optimization algorithm for a single-machine ...
J. (2006) Minimizing total flow time in the single-machine scheduling problem with periodic maintenance, Journal of the Operational Research Society, 57(4), 410-415. doi: 10.1057/palgrave.jors.2601998 ...
doi:10.17482/uumfd.856513
fatcat:mkhe2zjx2jfennen4ktqzmih24
INVERSE SCHEDULING IN FLOWSHOP WITH MULTIPLE MACHINES
2019
INTERNATIONAL JOURNAL OF PRODUCTION TECHNOLOGY AND MANAGEMENT
Traditional schedule will not address all these issues. In this paper, the inverse scheduling for multi machine flow shop with make span as objective is illustrated. ...
In order to meet market requirements, operations to be performed with optimal sequence in scheduling systems and should allow enough flexibility against uncertain events to a specific objective. ...
CONCLUSIONS In this paper, multi -machine inverse scheduling problem with make span time minimization is explored and suggested a heuristic to solve Firstly, a mathematical model is constructed and a genetic ...
doi:10.34218/ijptm.10.1.2019.003
fatcat:llxyltthxne3zmfe5t7kgbz4p4
Optimization of an integrated batch production and maintenance scheduling on flow shop with two machines
2019
International Journal of Industrial Engineering Computations
This paper discusses an integrated model of batch production and maintenance scheduling on flow shop with two deteriorating machines producing single item to be delivered at a due date. ...
The model describes the trade-off between production and maintenance costs as the production run length increases on two machines. ...
This research is funded by the grant of applied products scheme with contract number 039A/VR.RTT/VI/2017 by Department of Research and High Education Republic of Indonesia. ...
doi:10.5267/j.ijiec.2018.7.001
fatcat:ij3rp46vkfhyzdjkyabvkjv7uy
Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling
2016
ComTech
Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. ...
This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. ...
failure rate Weibull, and then calculate the number of corrective maintenance to minimize the total actual flow time. ...
doi:10.21512/comtech.v7i2.2247
fatcat:kmflhmcferastcbmwl6pm2xqmi
Using integer programming to solve the machine scheduling problem with a flexible maintenance activity
2006
Journal of Statistics & Management Systems
This work addresses the single machine and parallel machine scheduling problems, where machine is flexibly maintained and mean flow time is used as a performance measure. ...
Machine M k should be stopped for maintenance for a constant time w k in the schedule. ...
[25] , this study deals with scheduling jobs and maintenance activities with a single machine and parallel machine. The maintenance time of each machine is assumed to be known and fixed in advance. ...
doi:10.1080/09720510.2006.10701195
fatcat:nx54lrqlu5awznvtcvcwagejla
Joint consideration of production scheduling, maintenance and quality policies: a review and conceptual framework
2010
International Journal of Advanced Operations Management (IJAOM)
In the past, the shop floor level operational policies in the context of scheduling, maintenance and quality have been examined in isolation. ...
His areas of interest include productivity management, supply chain management, industrial engineering, operations research and operations management. 1 job-attributed criteria (e.g., job flow time) 2 ...
Graves and Lee (1999) formulated a single-machine scheduling problem with total weighted completion time as the objective function, but they schedule only one maintenance activity during the planning ...