Filters








209 Hits in 4.9 sec

TECHNIQUES AND APPLICATIONS OF PRODUCTION PLANNING IN ELECTRONICS MANUFACTURING SYSTEMS [chapter]

JOUNI SMED, MIKA JOHNSSON, TOMMI JOHTELA, OLLI NEVALAINEN
2003 Computer Aided and Integrated Manufacturing Systems  
In addition to this theoretical perspective, we will briefly review applications designed for production planning in PCB assembly.  ...  In this work we discuss production planning in electronics assembly-and, in particular, in PCB assembly.  ...  Yet, this rolling horizon framework is scarcely considered in the problem formulations of the PCB assembly literature.  ... 
doi:10.1142/9789812796813_0001 fatcat:ddkdmju5gna5rpsdjnvdyahvam

Management integration framework in a shop-floor employing self-contained assembly unit for optoelectronic products

Maurizio Fiasche, Gaia Ripamonti, Francesco G. Sisca, Marco Taisch, Anna A. Valente
2015 2015 IEEE 1st International Forum on Research and Technologies for Society and Industry Leveraging a better tomorrow (RTSI)  
In this paper the production planning, scheduling and control issues of white'R for HMLV optoelectronics is discussed and a management integration framework is proposed.  ...  This is the first paper with application of a general framework for HMLV products in a white room based, self-contained highly automated assembly environment.  ...  FUZZY LINEAR PROGRAMMING MODELS FOR APP AND DPP assembly level of product family i in line l in period t q jilt production level of item j of product family i in line l in period t z il unit assembly  ... 
doi:10.1109/rtsi.2015.7325159 fatcat:l53frkruwzcc3o4ft27luiljgu

Philips Electronics Synchronizes Its Supply Chain to End the Bullwhip Effect

Ton de Kok, Fred Janssen, Jan van Doremalen, Erik van Wachem, Mathieu Clerkx, Winfried Peeters
2005 Interfaces  
They focus on identifying possible follow-up actions to discuss within their organizations or with the subcontractors responsible for PCB assembly. "Any further issues? No? OK, thanks again.  ...  The demand for finished products is less variable than for subassemblies, which is less variable than for individual components. This phenomenon is known as the bullwhip or Forrester effect.  ...  Assembly, testing, and transportation take about three weeks. Several contract manufacturers assemble flex units and PCBs.  ... 
doi:10.1287/inte.1040.0116 fatcat:ms56tcen7jhg7a575zpum4u7ka

Planning and Scheduling in Supply Chains: An Overview of Issues in Practice

Stephan Kreipl, Michael Pinedo
2009 Production and operations management  
We then describe how planning and scheduling models can be used in the design and the development of decision support systems for planning and scheduling in supply chains and discuss in detail the implementation  ...  It first gives an overview of the various planning and scheduling models that have been studied in the literature, including lot sizing models and machine scheduling models.  ...  An assembly operation may be organized in workcells, in assembly lines, or according to a mixture of workcells and assembly lines.  ... 
doi:10.1111/j.1937-5956.2004.tb00146.x fatcat:fmp65exv3zfdvfe6yo757z77qa

A Genetic Regulatory Network-Based Method for Dynamic Hybrid Flow Shop Scheduling with Uncertain Processing Times

Youlong Lv, Jie Zhang, Wei Qin
2017 Applied Sciences  
The rolling horizon strategy is adopted to evaluate the difference between a predictive plan and the actual production process in terms of job delivery time.  ...  In this algorithm, decision variables within the rolling horizon are represented by genes in the network.  ...  Acknowledgments: The authors would like to acknowledge the financial support of the National Natural Science Foundation of China (No. 51435009; No. 51275307).  ... 
doi:10.3390/app7010023 fatcat:6rih5k2ijner7a5qqozz3uaraq

Comparisons of bi-objective genetic algorithms for hybrid flowshop scheduling with sequence-dependent setup times

S.M. Mousavi, M. Zandieh, M. Amiri
2012 International Journal of Production Research  
Among them, Sequence Dependent Setup Times-Multi-Objective Hybrid Flowshop Scheduling Problem (SDST-MOHFSP) has been an intensifying attention of researchers and practitioners in the last three decades  ...  A B S T R A C T Multi-criteria sequence dependent setup times scheduling problems exist almost everywhere in real modern manufacturing world environments.  ...  In this work, a scheduling problem in a PCB assembly line for inserting electronic components to produce a variety of PCB types was investigated ans a GA was presented.  ... 
doi:10.1080/00207543.2010.543178 fatcat:ch5qv36nyjedvojvytrmjh6wpu

The Italian Flagship Project: Factories of the Future [chapter]

Walter Terkaj, Tullio Tolio
2019 Factories of the Future  
Based on the elaboration of current context and research initiatives, the Italian Flagship Project Factories of the Future defined five research priorities for the future of the manufacturing industry.  ...  The results of the funded research projects are analysed in terms of scientific and industrial results, while providing references for more detailed descriptions in the specific chapters.  ...  The authors would like to thank Giacomo Copani and Margherita De Vivo for their contributions to this chapter.  ... 
doi:10.1007/978-3-319-94358-9_1 fatcat:wrvfbx7hcrhdtgtnleuhk462pm

:{unav)

R.P. Lin, B.R. Dennis, G.J. Hurford, D.M. Smith, A. Zehnder, P.R. Harvey, D.W. Curtis, D. Pankow, P. Turin, M. Bester, A. Csillaghy, M. Lewis (+54 others)
2012 Solar Physics  
RHESSI is the sixth in the NASA line of Small Explorer (SMEX) missions and the first managed in the Principal Investigator mode, where the PI is responsible for all aspects of the mission except the launch  ...  lines.  ...  We wish to acknowledge the efforts of the technical and support staff at the SSL, GSFC, and PSI; of Dennis Lee, Bill Davis, Jim Barrowman,and Tony Comberiate in the Explorer office at GSFC; and of Bill  ... 
doi:10.1023/a:1022428818870 fatcat:ns7yomgqfngfvbb3w2aw4l4iae

Ability to Be Machined [chapter]

2014 CIRP Encyclopedia of Production Engineering  
Zettier (Technical University of Berlin), Figure 5 ; C.Z. Duan and L.C. Zhang (University of New South Wales),  ...  Acknowledgments I wish to thank the following people for making available chip section pictures from their original work and allowing me to include them in this entry: J.  ...  Work-in-process management Assembly Line, Fig. 1 Scheme of a typical semiautomatic assembly line (CIRP 2004) Assembly Line, Fig. 2 Assembly of the flywheel magneto for the T Model at Ford (Shimokawa  ... 
doi:10.1007/978-3-642-20617-7_100003 fatcat:udobek4l65b2lhyf3hmj5j4rvi

Everything In Electronics Between the Chin and the System

2021 Advancing Microelectronics Magazine  
In addition, we would like to acknowledge the support of the technology group at i3 Electronics in Binghamton, NY: John Millard, Michael Hyde, and Rick Wade for their support in solder ball attach and  ...  Special mention is made to Keith Kunard who is instrumental in the design and build of the RTV module.  ...  SMT Assembly of the Package The SMT [28] assembly of the heterogeneous integration package on PCB is shown in Figure 16 .  ... 
doi:10.4071/2380-7016-48.3.1 fatcat:jyc6gwe37jddveng5kstouscge

System-in-Package (SiP)

2021 Advancing Microelectronics Magazine  
In addition, we would like to acknowledge the support of the technology group at i3 Electronics in Binghamton, NY: John Millard, Michael Hyde, and Rick Wade for their support in solder ball attach and  ...  Special mention is made to Keith Kunard who is instrumental in the design and build of the RTV module.  ...  SMT Assembly of the Package The SMT [28] assembly of the heterogeneous integration package on PCB is shown in Figure 16 .  ... 
doi:10.4071/2380-7016-48.2.1 fatcat:jvlvfn5usva4jgufeoq2j5nzju

Reducing myopic behavior in FMS control: A semi-heterarchical simulation–optimization approach

Gabriel Zambrano Rey, Thérèse Bonte, Vittaldas Prabhu, Damien Trentesaux
2014 Simulation modelling practice and theory  
This is the term used in ATC for the sake of generality. Flexible Assembly Line 2 Job-shop scheduling problem 3 Single Machine  ...  Therefore, in the predictive phase ( Figure within the time horizon, as it is handled in rolling horizon approaches (Jia et al., 2009) .  ...  Therefore, the operation of a single-machine is dictated by the sequence in which products pass by the machine, and the formation of product batches for scheduling setup operations (Coffman et al., 1990  ... 
doi:10.1016/j.simpat.2014.01.005 fatcat:7bqsmoebm5c7fh6xvu7xre2r7e

BICEP2. II. EXPERIMENT AND THREE-YEAR DATA SET

P. A. R. Ade, R. W. Aikin, M. Amiri, D. Barkats, S. J. Benton, C. A. Bischoff, J. J. Bock, J. A. Brevik, I. Buder, E. Bullock, G. Davis, P. K. Day (+39 others)
2014 Astrophysical Journal  
BICEP2 was designed to measure the polarization of the cosmic microwave background (CMB) on angular scales of 1 to 5 degrees (ℓ=40-200), near the expected peak of the B-mode polarization signature of primordial  ...  After optimization of detector and readout parameters, BICEP2 achieved an instrument noise-equivalent temperature of 15.8 μK sqrt(s).  ...  It was constructed from an aluminum cylinder with a rolled lip lined with 10 mm thick sheets of Eccosorb HR.  ... 
doi:10.1088/0004-637x/792/1/62 fatcat:jmev3ym4ifejtdkqwnzuoqzqr4

The Long Baseline Neutrino Experiment (LBNE) Water Cherenkov Detector (WCD) Conceptual Design Report (CDR) [article]

The LBNE Collaboration
2012 arXiv   pre-print
Conceptual Design Report developed for the Water Cherenkov Detector (WCD) option for the far detector of the Long Baseline Neutrino Experiment.  ...  Both the production schedule and the commercialization of these devices are potential roadblocks for implementing MCPs for LBNE.  ...  The two most important methods are: Line-leveling is a technique that monitors the flow of work through a multi-stage process.  ... 
arXiv:1204.2295v1 fatcat:yuki457rivef5li4h2d3n3dyey

CMB-S4 Science Case, Reference Design, and Project Plan [article]

Kevork Abazajian, Graeme Addison, Peter Adshead, Zeeshan Ahmed, Steven W. Allen, David Alonso, Marcelo Alvarez, Adam Anderson, Kam S. Arnold, Carlo Baccigalupi, Kathy Bailey, Denis Barkats (+190 others)
2019 arXiv   pre-print
We present the science case, reference design, and project plan for the Stage-4 ground-based cosmic microwave background experiment CMB-S4.  ...  For instance, it could indicate that the inflaton field was not slowly rolling when the largest scales exited the horizon.  ...  The flex lines are glued to the backplate and Al wirebonded to the PCB housing the micro-D connectors.  ... 
arXiv:1907.04473v1 fatcat:7lqitlzxefgizgekpzpccbdc3y
« Previous Showing results 1 — 15 out of 209 results