Filters








19,226 Hits in 4.3 sec

Coordinated scheduling of production and delivery with production window and delivery capacity constraints

Bin Fu, Yumei Huo, Hairong Zhao
2012 Theoretical Computer Science  
This paper addresses the problem of coordinated scheduling of production and delivery subject to the production window constraint and the delivery capacity constraint.  ...  There is a set of jobs each with a committed delivery time, processing time, production window, and profit.  ...  Let J k,1 be the first job in the k-th list, and the start time of its production window is l k,1 .  ... 
doi:10.1016/j.tcs.2011.11.035 fatcat:mfbx4k25svgnrchpgqkicpiq3y

Coordinated Scheduling of Production and Delivery with Production Window and Delivery Capacity Constraints [chapter]

Bin Fu, Yumei Huo, Hairong Zhao
2010 Lecture Notes in Computer Science  
This paper addresses the problem of coordinated scheduling of production and delivery subject to the production window constraint and the delivery capacity constraint.  ...  There is a set of jobs each with a committed delivery time, processing time, production window, and profit.  ...  Let J k,1 be the first job in the k-th list, and the start time of its production window is l k,1 .  ... 
doi:10.1007/978-3-642-14355-7_15 fatcat:hmzqibvfpffilhg7yybeluq27m

Planning and Scheduling for Dispersed and Collaborative Productive System [chapter]

Marcosiris A. O. Pessoa, Fabrício Junqueira, Paulo E. Miyagi, Diolino J. Santos Fo
2011 IFIP Advances in Information and Communication Technology  
These PSs work with small and medium size production lots, product families with increasing variety, and hard delivery date.  ...  Then, a planning service based on time windows and a scheduling service that uses the APS (advanced planning and scheduling) heuristics is proposed to assure the expected performance of the DCPS.  ...  The authors would like to thank the Brazilian governmental agencies CAPES, CNPq and FAPESP, for their partial support to this work.  ... 
doi:10.1007/978-3-642-19170-1_6 fatcat:seod44addjh4hd32vzk6dvy3f4

Parallel Machine Production and Transportation Operations' Scheduling with Tight Time Windows

Yang Jiang, Tong He, Jie Xiong, Xin Wu, Yao Chen, Lingzhong Guo
2020 Complexity  
This study addresses a parallel machine production and transportation operations' scheduling problem with a tight time window associated with the transfer and delivery process.  ...  A mathematical analysis method is used to reveal the impact of tight time windows on the scheduling of production and transportation operations.  ...  Section 3.3 develops a coordination scheduling model of parallel machine production and transportation operations to maximize the coordination level of order transfer and delivery, which reflects OT and  ... 
doi:10.1155/2020/1381340 fatcat:ca3t7mu2xndmpcdykv7iorxnqe

ACHIEVING X-SIGMA DELIVERIES IN SUPPLY CHAINS

Danqing Yu, Peter B. Luh, Shi-Chung Chang
2005 IFAC Proceedings Volumes  
To stay competitive, it is critical to control variability and order lead-times across a chain, and to achieve delivering final products within specified target time windows with high probability.  ...  An effective solution methodology is developed to minimize overall order tardiness, earliness costs and delivery variability through effective scheduling and coordination.  ...  And effective scheduling and coordinating across the chain are needed to achieve a shared goal of x-sigma delivery.  ... 
doi:10.3182/20050703-6-cz-1902.01487 fatcat:e33pw3ivbzbujhgi5zofjbae4q

Coordination of production scheduling and delivery problems with heterogeneous fleet

Chinyao Low, Chien-Min Chang, Rong-Kwei Li, Chia-Ling Huang
2014 International Journal of Production Economics  
In a production scheduling with delivery problem, there are different types of products processed by a distribution center and then delivered to retailers.  ...  The resolution of this problem is to determine the production sequence, retailers' needs to heterogeneous fleet of vehicles and the visiting sequence of each vehicle for delivery goods within time windows  ...  We first present an integer nonlinear programming model for the addressed problem which is the integration of a production scheduling and vehicle routing problem with a time window constraint.  ... 
doi:10.1016/j.ijpe.2014.02.014 fatcat:wgcrhyovxvagtdge5gdv42z2mu

Dynamic Lot Optimization of Assembly Supply Chain with Delivery Time Constraint

Shuang-yan Li, De-zhi Zhang, Fang-ping Jin
2013 International Business Research  
Delivery time to clients form a time window that limits point to assembly manufacturer delivery start and end time.  ...  Ability constraint in the process of supply chain operation, time constraints and assembly production constrain are all considered in the inventory control dynamic batch optimization model.  ...  Classical dynamic lot-sizing problem by considering production capacity constraints as well as delivery and/or production time windows was summarized (Hwang, Jaruphongsa, Çetinkaya & Lee, 2010) .  ... 
doi:10.5539/ibr.v6n11p73 fatcat:voqzvxynyvbclehpgmasbjbqnq

Integrated Production and Distribution Problem of Perishable Products with a Minimum Total Order Weighted Delivery Time

Liu, Liu
2020 Mathematics  
capacity constraints are considered.  ...  The objective is to minimize the total order weighted delivery time to measure the customer service level, by making two interacted decisions, production scheduling and vehicle routing, simultaneously.  ...  The time windows constraint was also relaxed in [22] , the scheduling of production and delivery were considered in a make-to-order environment considering a single machine, multi-customers, and multi-vehicles  ... 
doi:10.3390/math8020146 fatcat:s3zdlec2zrgkjosko43cmewcsi

Integrated Air Transportation and Production Scheduling Problem with Fuzzy Consideration

Amir Mohammad Fathollahi Fard, Mostafa Hajiaghaei-Keshteli
2018 International Journal of Industrial Engineering and Production Research  
This study firstly develops and coordinates the integrated air transportation and production scheduling problem with time windows and due date time in Fuzzy environment to minimize the total cost.  ...  Nowadays, several methods in production management mainly focus on the different partners of supply chain management. In real world, the capacity of planes is limited.  ...  [11] studied the coordination of the production scheduling and delivery under two main restrictions: time windows and delivery capacity. In 2014, Low et al.  ... 
doaj:abf8fa41a9b344e1acf433a767f9c2a2 fatcat:o67dz77snbaldgj47y2r4joowe

Integrated order acceptance and scheduling decision making in product service supply chain with hard time windows constraints

Bin Dan, Huali Gao, Yang Zhang, Ru Liu, Songxuan Ma
2017 Journal of Industrial and Management Optimization  
For PSS orders are usually delivered under time window constraints, this paper is concerned with the integrated order acceptance and scheduling (OAS) decision of the PSSC.  ...  A product service supply chain (PSSC) supplies customers with product-service systems (PSS) consist of integrated products and services.  ...  We would like to thank the editors and referees for their valuable comments and suggestions.  ... 
doi:10.3934/jimo.2017041 fatcat:lr57q5cv4jhuhcr4n3xvj4rbay

Combining vehicle routing and packing for optimal delivery schedules of water tanks

Jacob Stolk, Isaac Mann, Arvind Mohais, Zbigniew Michalewicz
2013 OR Insight  
A delivery schedule consists of a number of delivery trips by trucks. An optimal delivery schedule minimises cost to deliver a given total sales value of delivered products.  ...  To construct an optimal delivery schedule, trucks need to be optimally packed with water tanks and accessories to be delivered to a set of delivery locations.  ...  Pflaum and Ayaz Hassan; business analysts Josh Boston and Daniel Spitty; scientist Mohammadreza Bonyadi, various testers at SolveIT Software.  ... 
doi:10.1057/ori.2013.1 fatcat:syga75ggcff7bfsc6vdi7cpw4u

A heuristic approach for short-term operations planning in a catering company

P. Farahani, M. Grunow, H. O. Gunther
2009 2009 IEEE International Conference on Industrial Engineering and Engineering Management  
Certain types of food such as catering foods decay very rapidly. This paper investigates how the quality of such foods can be improved by shortening the time interval between production and delivery.  ...  The production scheduling problem is solved through an MILP modeling approach which is based on a block planning formulation complemented by a heuristic simplification procedure.  ...  needed to deliver order to loca- tion j after i • Capacity of vehicles • Volume of order i • Duration of the delivery process for order i • , Earliest and latest time for delivery of order  ... 
doi:10.1109/ieem.2009.5372966 fatcat:zxhfmslmsrbsdnlnnuxkhrdhwy

Delivery Volume Optimization

Ann Melissa Campbell, Martin W. P. Savelsbergh
2004 Transportation Science  
This problem is not as easy as it may seem at first glance because of delivery windows at customers and the two dueling effects of increased inventory holding capacity at customers as time progresses and  ...  In this paper, we develop a linear time algorithm for determining a delivery schedule for a route, i.e., a given sequence of customer visits, that maximizes the total amount of product that is delivered  ...  Route Duration Constraints As mentioned in the introduction, our work on DVO and more generally on IRP, was motivated by our collaboration with a producer and distributor of air products.  ... 
doi:10.1287/trsc.1030.0042 fatcat:r6pngglelbbbdgjkmbmf3sw3aa

Scheduling Just-in-Time Transport Vehicles to Feed Parts for Mixed Model Assembly Lines

Yunfang Peng, Tian Zeng, Yajuan Han, Beixin Xia
2020 Discrete Dynamics in Nature and Society  
A mixed integer linear programming model with the primary objective of using the least number of tow trains is constructed by considering capacity of vehicle and inventory levels of line.  ...  Furthermore, some cases are analyzed and compared with the widely used periodic delivery strategy, and the feasibility of just-in-time model and algorithm is verified.  ...  Muller studied the vehicle scheduling problem with soft time windows, considered penalty function that violates time window, and used a two-stage heuristic algorithm to calculate approximate solution of  ... 
doi:10.1155/2020/2939272 fatcat:5vatxou7gvfybarvbvz7i2vwj4

A macro-level scheduling method using Lagrangian relaxation

Yuanhui Zhang, P.B. Luh, K. Narimatsu, T. Moriya, T. Shimada, Lei Fang
2001 IEEE Transactions on Robotics and Automation  
In this paper, a macro-level scheduling method is developed to provide high-level planning support for factories with multiple coordinating cells.  ...  The goal is to properly allocate resources, efficiently handle complicated process plans, and coordinate cells to ensure on-time delivery, low working-in-process inventory, and small resource overload.  ...  He is interested in manufacturing planning, scheduling, and supply chain coordination, and has developed near-optimal and computationally efficient methods to improve on-time delivery of products and reduce  ... 
doi:10.1109/70.917084 fatcat:m7fli4ah7zbk7mmw4wyuysryvu
« Previous Showing results 1 — 15 out of 19,226 results