Filters








11 Hits in 15.4 sec

Lot streaming with variable sublots: an integer programming formulation

D Biskup, M Feldmann
2006 Journal of the Operational Research Society  
Lot streaming with detached setups in three-machine flow shops. Eur J Opns Res 96: 591-611. $ Chen J and Steiner G (1998). Lot streaming with attached setups in three-machine flow shops.  ...  A near-optimal heuristic for the sequencing problem in multiple-batch flow shops with small equal sublots. Omega—Int J Mngt S 29: 577-584. Glass CA, Gupta JND and Potts CN (1994).  ... 
doi:10.1057/palgrave.jors.2602016 fatcat:zh2locyqargizdfk3ckhdvra7u

Scheduling with lot streaming in a two-machine re-entrant flow shop

Ferda Can Cetinkaya, Department of Industrial Engineering, Çankaya University, Ankara, Turkey, Mehmet Duman, NERITA, Near East University, TRNC, Mersin 10, Turkey
2021 Operational Research in Engineering Sciences: Theory and Applications  
In this study, we consider a scheduling problem with lot streaming in a two-machine re-entrant flow shop in which each job-lot is processed first on Machine 1, then goes to Machine 2 for its second operation  ...  Lot streaming is splitting a job-lot of identical items into several sublots (portions of a lot) that can be moved to the next machines upon completion so that operations on successive machines can be  ...  Acknowledgements: We would like to thank the editor and anonymous referees for their valuable comments and suggestions that helped us to improve the quality and presentation of this paper.  ... 
doi:10.31181/oresta111221142c fatcat:pbqye7x5dvgv3id7wtoe7fgiqe

Page 7472 of Mathematical Reviews Vol. , Issue 2004i [page]

2004 Mathematical Reviews  
flow-shop lot streaming problem with sublot-attached setups.  ...  In this paper, we consider the single and multiple batch flow- shop lot-streaming problems with sublot-attached setup times.  ... 

Lot streaming in a multiple product permutation flow shop with intermingling

M. Feldmann, D. Biskup
2007 International Journal of Production Research  
In this paper we study the multi-product lot streaming problem in a permutation flow shop.  ...  As no lot streaming instances are available in the literature, LSGen, a problem generator is presented, facilitating valid and reproducible instances.  ...  Acknowledgments We wish to thank two anonymous referees for their helpful comments on an earlier version of this paper.  ... 
doi:10.1080/00207540600930065 fatcat:oho57xwlmzeb7bnpjwbx3jghs4

A Survey on Parallel Genetic Algorithms for Shop Scheduling Problems

Jia Luo, Didier El Baz
2018 2018 IEEE International Parallel and Distributed Processing Symposium Workshops (IPDPSW)  
There have been extensive works dealing with genetic algorithms (GAs) for seeking optimal solutions of shop scheduling problems. Due to the NP hardness, the time cost is always heavy.  ...  With the development of high performance computing (HPC) in last decades, the interest has been focused on parallel GAs for shop scheduling problems.  ...  ACKNOWLEDGMENT This work was supported by a scholarship from the China Scholarship Council (CSC).  ... 
doi:10.1109/ipdpsw.2018.00103 dblp:conf/ipps/LuoB18 fatcat:kabw5jzsjrf7lfv4kvknc7z4q4

Equal opportunity employer?

R P Taylor
1990 Nursing Standard  
These Construction and Material Specifications are written to the Bidder before award of the Contract and to the Contractor after award of the Contract.  ...  Sentences written in the active voice identify the party responsible for performing the action. For example, "The Engineer will determine the density of the compacted material."  ...  The Department will determine the pay factor for each Lot cored by the pay schedule in Table 446 .05-1 for Lots with three cold longitudinal joint cores and Table 446 .05-2 for Lots with less than three  ... 
doi:10.7748/ns.5.11.42.s51 fatcat:c6wphqvxojdkjg6usy7qcxxwf4

Enclosing rail capacity/punctuality in accessibility measures: a two-step approach by using Data Envelopment Analysis and Analytic Hierarchy Process

Francesco Rotoli, Elena Navajas Cawood, Lorenzo Vannacci
2015 2015 International Conference on Industrial Engineering and Systems Management (IESM)  
, their schedules and the associated transportation itineraries for the forecast demand.  ...  We conclude with a number of challenging research directions.  ...  The problem is considered as a flow shop scheduling with parallel machines (beds).  ... 
doi:10.1109/iesm.2015.7380133 fatcat:hbiqir2zo5bejlasdudkjzom2e

Page 3059 of Mathematical Reviews Vol. , Issue Index [page]

Mathematical Reviews  
(with Sarin, Subhash C.) Constructing near optimal schedules for the flow- shop lot streaming problem with sublot-attached setups.  ...  (with Khouja, Moutaz) An optimal polynomial time algorithm for the common cycle economic lot and delivery scheduling problem. (English summary) Jiang, Houyuan sce Ernst, Andreas T. et al.  ... 

Page 2196 of Mathematical Reviews Vol. , Issue Index [page]

Mathematical Reviews  
(with Kalir, Adar A.) Constructing near optimal schedules for the flow-shop lot streaming problem with sublot-attached setups. (English summary) J. Comb. Optim. 7 (2003), no. 1, 23-44.  ...  A third derivative test for mean values of exponential sums with application to lattice point problems. Acta Arith. 106 (2003), no. 1, 27-39. (S. W.  ... 

Page 1163 of Mathematical Reviews Vol. , Issue Index [page]

Mathematical Reviews  
(with Sarin, Subhash C.) Constructing near optimal schedules for the flow-shop lot streaming problem with sublot-attached setups. (English summary) J. Comb. Optim. 7 (2003), no. 1, 23-44.  ...  On the Green function for the first initial-boundary value problem for the heat equation with a discontinuous coefficient in a plane angle. (Russian. English, Russian and Kazakh summaries) /zv.  ... 

A Systematic Review of Analytical Management Techniques in Business Process Modelling for SMEs Beyond What-if-Analysis and Towards a Framework for Integrating Them with BPM

Dimitrios A. Karras, Rallis C. Papademetriou
2017 Proceedings of the Seventh International Symposium on Business Modeling and Software Design   unpublished
We thank the members in our former units for their support and the time they spent with us during this work.  ...  ACKNOWLEDGEMENTS The authors thank Florian Sorg and Tobias Maas for their assistance with the design, implementation, and evaluation.  ...  Information flows for the shop floor must be designed taking all kinds of information for the shop floor into account, and not only deal with information in computer systems.  ... 
doi:10.5220/0006527900990110 fatcat:s5va26lhsjbsrdnpt55hg7sale