Filters








5,541 Hits in 3.5 sec

Dynamic Staffing and Rescheduling in Software Project Management: A Hybrid Approach

Yujia Ge, Bin Xu, Yong Deng
2016 PLoS ONE  
Rescheduling happens commonly and frequently during the project execution. Control options have to be made when new resources are added or tasks are changed.  ...  Resource allocation could be influenced by various dynamic elements, such as the skills of engineers and the growth of skills, which requires managers to find an effective and efficient tool to support  ...  We also propose a software project rescheduling approach considering efficiency and stability.  ... 
doi:10.1371/journal.pone.0157104 pmid:27285420 pmcid:PMC4902186 fatcat:wfhui5eytrcrzgbvmz5is3wfoy

Resource Constrained Scheduling within Fixed Project Durations

R. K-Y. Li, R. J. Willis
1993 Journal of the Operational Research Society  
WILLIS Monash University, Australia This paper presents a practical approach for resource constrained scheduling within a given project duration.  ...  When a project is running late, the project manager needs to reschedule the project to assess the impact of delays on the overall project duration.  ... 
doi:10.1057/jors.1993.8 fatcat:auken2yrizgdtm7jodvgdwz6ca

Resource Constrained Project Scheduling with Dynamic Disruption Recovery

Forhad Zaman, Saber Elsayed, Ruhul Sarker, Daryl Essam
2020 IEEE Access  
Resource-constrained project scheduling is one of the most widely studied research problems.  ...  This paper investigates different cost-effective measures for project scheduling problems under resource disruptions, in which the disrupted resources are dynamically recovered as the project progresses  ...  Therefore, the project manager may have to reschedule activities in order to complete the project efficiently. For rescheduling, there are a few approaches in the literature.  ... 
doi:10.1109/access.2020.3014940 fatcat:n3kvcodwrbfjxndbtbu2ulxkly

What about Train Length and Energy Efficiency of Freight Trains in Rescheduling Models?

Ambra Toletti, Valerio De Martinis, Ulrich Weidmann
2015 Transportation Research Procedia  
The first aim of this paper is to investigate how current scheduling and rescheduling models consider train length and energy efficiency.  ...  The second aim is to extend a scheduling model that considers train length and energy efficiency for drafting a rescheduling model that minimizes not only delays but also energy consumption.  ...  Though, the EU showed particular attention to even longer freight trains, e.g. project Marathon (NEWOPERA Aisbl, 2014) , in order to reduce costs and improve efficiency in operation.  ... 
doi:10.1016/j.trpro.2015.09.012 fatcat:bjvcy3shbfgjjh52rjddvmrmti

Robust and reactive project scheduling: a review and classification of procedures

Willy Herroelen, Roel Leus
2004 International Journal of Production Research  
Predictive-reactive scheduling refers to the process where a baseline schedule is developed prior to the start of the project and updated if necessary during project execution.  ...  We also offer a framework that should allow project management to identify the proper scheduling methodology for different project scheduling environments.  ...  Rescheduling Rescheduling may use any deterministic performance measure, such as the new project makespan (in manufacturing systems, this approach is sometimes referred to as (complete) regeneration).  ... 
doi:10.1080/00207540310001638055 fatcat:3ai5drfdurfgroby5eieqcu7mu

Applying Local Rescheduling in response to schedule disruptions

Jürgen Kuster, Dietmar Jannach, Gerhard Friedrich
2008 Annals of Operations Research  
As existing approaches (such as Affected Operations Rescheduling or Matchup Scheduling) mainly focus on production-specific problems, we propose Local Rescheduling (LRS) as a generic approach to partial  ...  It integrates previous research on partial rescheduling and local search in the context of complex project scheduling problems.  ...  The Extended RCPSP The Resource-Constrained Project Scheduling Problem (RCPSP, see Błazewicz, Lenstra and Kan (1983) as well as Brucker et al. (1999) ) provides a framework for the formalization of  ... 
doi:10.1007/s10479-008-0488-x fatcat:s56ijv3pzrbh7ipq5bjgehbf5q

Managing Uncertainty and Disruptions in Resource Constrained Project Scheduling Problems: A Real-Time Reactive Approach

Md. Humyun Fuad Rahman, Ripon K. Chakrabortty, Michael J. Ryan
2021 IEEE Access  
Resource constrained project scheduling problems (RCPSPs) are complex optimization problems that aim to minimize project completion time after considering limited resources and precedencerelated activities  ...  INDEX TERMS Scheduling real-life projects, project scheduling with uncertainty and disruption, iterated greedy algorithm, chance constrained approach.  ...  They developed a GA approach to solve their model which was later proved to be efficient through comparison with a number of existing approaches.  ... 
doi:10.1109/access.2021.3063766 fatcat:gknn3o7p6ng6najlwwmlvkrbwi

Handling Alternative Activities in Resource-Constrained Project Scheduling Problems

Jürgen Kuster, Dietmar Jannach, Gerhard Friedrich
2007 International Joint Conference on Artificial Intelligence  
of alternative resources can be assessed by the application of generic scheduling frameworks such as the Resource-Constrained Project Scheduling Problem (RCPSP).  ...  Beside a formal description of the conceptual extension, we show how such generalized rescheduling problems can be solved by a novel genetic algorithm and summarize the promising results of a detailed  ...  Acknowledgments This research project was partly funded by grants from (1) FFF Austria, Project cdm@airports, and (2) the European Union, Project WS-Diamond, Contract 516933.  ... 
dblp:conf/ijcai/KusterJF07 fatcat:mw7wjzp54nccfmxisotdynxi6y

Identification of determinants for rescheduling travel mode choice and transportation policies to reduce car use in urban areas

Lidón Mars, Tomás Ruiz, Rosa Arroyo
2018 International Journal of Sustainable Transportation  
This paper presents a qualitative analysis about the determinants related to rescheduling travel mode decisions during the activity scheduling process.  ...  The Theory of Planned Behavior has been used to gain a better understanding of the reasons associated with rescheduling travel mode decisions and to obtain a possible explanation of the phenomena studied  ...  projects.  ... 
doi:10.1080/15568318.2017.1416432 fatcat:hcz7w6vnpncg7ke7hehcmctfee

Local Rescheduling - A Novel Approach for Efficient Response to Schedule Disruptions

Jurgen Kuster, Dietmar Jannach, Gerhard Friedrich
2007 2007 IEEE Symposium on Computational Intelligence in Scheduling  
To overcome this limitation, we introduce a novel approach to partial rescheduling in this paper: Local Rescheduling (LRS) is based on the incremental extension of a time window which is regarded for potential  ...  However, existing approaches such as Affected Operations Rescheduling (AOR) or Matchup Scheduling (MUP) focus on production-specific problems and can not be applied to more generic problem classes.  ...  THE EXTENDED RCPSP The Resource-Constrained Project Scheduling Problem (RCPSP, see [10] , [11] ) provides a framework for the formalization of scheduling problems.  ... 
doi:10.1109/scis.2007.367673 dblp:conf/cisched/KusterJF07 fatcat:mdcvfyrf75bgpoa2duastjln4a

Model-based dynamic software project scheduling

Natasha Nigar
2017 Proceedings of the 2017 11th Joint Meeting on Foundations of Software Engineering - ESEC/FSE 2017  
Recent studies addressed this challenge in both static and dynamic scenarios for small and medium size software projects.  ...  Software project scheduling, under uncertain and dynamic environments, is one of the most important challenges in software engineering.  ...  Contrary, the dynamic approaches consider rescheduling.  ... 
doi:10.1145/3106237.3119879 dblp:conf/sigsoft/Nigar17 fatcat:2a4cv6gyfzcdrm6d76yeily7ze

Rescheduling in Industrial Environments: Emerging Technologies and Forthcoming Trends

Carmen L. Garcia-Mata, Pedro Rafael Márquez-Rodríguez, Larysa Burtseva
2015 International Journal of Combinatorial Optimization Problems and Informatics  
However, traditionally the schedules generated for those environments are deterministic, or quasideterministic at the best, and only recently the approach static is being shifted for a stochastic approach  ...  Another important objective of our report is to bring the attention of researchers to emerging methodologies and technologies coming from the subject of Knowledge Representation and Reasoning.  ...  The projects of this kind are stochastic versions of the basic scheduling problem in a deterministic setting, known as a resource-constrained project schedule problem (RCPSP).  ... 
dblp:journals/ijcopi/Garcia-MataMB15 fatcat:hd7c4tretfai7jgcjajrqwvaqe

On the merits and pitfalls of critical chain scheduling

W Herroelen
2001 Journal of Operations Management  
to project management.  ...  The direct application of the Theory of Constraints (TOC) to project management, known as Critical Chain Scheduling and Ruffer Management (Cc/RM), has recently emerged as one of the most popular approaches  ...  the most popular approaches to project management.  ... 
doi:10.1016/s0272-6963(01)00054-7 fatcat:2uobltk4incpbojrrbrbrb6zwi

Sounds of Silence: a sampling-based bi-criteria harmony search metaheuristic for the resource constrained project scheduling problem with uncertain activity durations and cash flows

Sándor Danka
2014 Periodica polytechnica. Civil engineering  
In this paper, we present a new sampling-based bi-criteria hybrid harmony search metaheuristic for the resource-constrained project-scheduling problem (RCPSP) with uncertain activity durations (UAD) and  ...  In the presented hybrid approach, we applied a sampling-based approximation to cope with the uncertain cash flows.  ...  In this paper, we present a new sampling-based bi-criteria (total project duration (TPD) and net present value (NPV)) hybrid harmony search metaheuristic for the resource-constrained project-scheduling  ... 
doi:10.3311/ppci.7051 fatcat:uckgircqdbgklaesdfyyiqkypi

Solving project scheduling problems with a heuristic learning algorithm

R Zamani, L-Y Shue
1998 Journal of the Operational Research Society  
A comparison of exact approaches for solving the multi-constrained resource project scheduling. Memt Sci 30: 854-867. Boctor F (1990).  ...  to prune off search branches to increase the efficiency.  ... 
doi:10.1038/sj.jors.2600546 fatcat:cpdjhmcuvrezfnvurxzi2awrra
« Previous Showing results 1 — 15 out of 5,541 results