Virtualizing power distribution in datacenters

Di Wang, Chuangang Ren, Anand Sivasubramaniam
2013 Proceedings of the 40th Annual International Symposium on Computer Architecture - ISCA '13  
With aggressive under-provisioning, the power hierarchy becomes as central a datacenter resource as other computing resources, making it imperative to carefully allocate, isolate and manage this resource  ...  Using several datacenter applications, and a 2-level power hierarchy prototype containing batteries at both levels, we demonstrate the effectiveness of vPower when working in an under-provisioned power  ...  in aggressively under-provisioned settings.  ... 
doi:10.1145/2485922.2485973 dblp:conf/isca/WangRS13 fatcat:op2adt6wkndc7c2imyz5xqkqli

Virtualizing power distribution in datacenters

Di Wang, Chuangang Ren, Anand Sivasubramaniam
2013 SIGARCH Computer Architecture News  
With aggressive under-provisioning, the power hierarchy becomes as central a datacenter resource as other computing resources, making it imperative to carefully allocate, isolate and manage this resource  ...  Using several datacenter applications, and a 2-level power hierarchy prototype containing batteries at both levels, we demonstrate the effectiveness of vPower when working in an under-provisioned power  ...  in aggressively under-provisioned settings.  ... 
doi:10.1145/2508148.2485973 fatcat:xsj7kccewfakxb4zw24shbjhmq

Leveraging stored energy for handling power emergencies in aggressively provisioned datacenters

Sriram Govindan, Di Wang, Anand Sivasubramaniam, Bhuvan Urgaonkar
2012 SIGARCH Computer Architecture News  
the datacenter with more power headroom.  ...  We build an experimental prototype to demonstrate such power capping on a cluster of 8 servers, each with an individual battery, and implement several online heuristics in the context of different datacenter  ...  The goal of this paper is to deal with the rare ("black swan") power emergencies (when the draw exceeds provisioned power) that arise in such aggressively provisioned datacenters in a seamless and graceful  ... 
doi:10.1145/2189750.2150985 fatcat:sxjn4czj75hyxftkx3uyfogrqu

Leveraging stored energy for handling power emergencies in aggressively provisioned datacenters

Sriram Govindan, Di Wang, Anand Sivasubramaniam, Bhuvan Urgaonkar
2012 Proceedings of the seventeenth international conference on Architectural Support for Programming Languages and Operating Systems - ASPLOS '12  
the datacenter with more power headroom.  ...  We build an experimental prototype to demonstrate such power capping on a cluster of 8 servers, each with an individual battery, and implement several online heuristics in the context of different datacenter  ...  The goal of this paper is to deal with the rare ("black swan") power emergencies (when the draw exceeds provisioned power) that arise in such aggressively provisioned datacenters in a seamless and graceful  ... 
doi:10.1145/2150976.2150985 dblp:conf/asplos/GovindanWSU12 fatcat:nea4y7cugjg3bli6g656ix2oty

Benefits and limitations of tapping into stored energy for datacenters

Sriram Govindan, Anand Sivasubramaniam, Bhuvan Urgaonkar
2011 SIGARCH Computer Architecture News  
Using insights learned from this analysis, we develop peak reduction algorithms that combine the UPS battery knob with existing throttling based techniques for minimizing datacenter power costs.  ...  We conduct detailed analysis of battery operation to figure out feasible operating regions given such battery lifetime and datacenter availability concerns.  ...  Even with aggressive provisioning going forward, hybrid techniques can provide better savings than pure throttling.  ... 
doi:10.1145/2024723.2000105 fatcat:qxv3gcldtjfgjctgadfl4kez2e

Benefits and limitations of tapping into stored energy for datacenters

Sriram Govindan, Anand Sivasubramaniam, Bhuvan Urgaonkar
2011 Proceeding of the 38th annual international symposium on Computer architecture - ISCA '11  
Using insights learned from this analysis, we develop peak reduction algorithms that combine the UPS battery knob with existing throttling based techniques for minimizing datacenter power costs.  ...  We conduct detailed analysis of battery operation to figure out feasible operating regions given such battery lifetime and datacenter availability concerns.  ...  Even with aggressive provisioning going forward, hybrid techniques can provide better savings than pure throttling.  ... 
doi:10.1145/2000064.2000105 dblp:conf/isca/GovindanSU11 fatcat:uhohxutetrdqjosw7xhpjreula

BAAT: Towards Dynamically Managing Battery Aging in Green Datacenters

Longjun Liu, Chao Li, Hongbin Sun, Yang Hu, Juncheng Gu, Tao Li
2015 2015 45th Annual IEEE/IFIP International Conference on Dependable Systems and Networks  
Energy storage devices (batteries) have shown great promise in eliminating supply/demand power mismatch and reducing energy/power cost in green datacenters.  ...  Moreover, it reduces 26% battery cost and allows datacenters to economically scale in the big data era.  ...  Battery provisioning in datacenters: Deploying batteries as energy buffers in datacenters to reduce power cost and improve power quality have received increasing attention.  ... 
doi:10.1109/dsn.2015.43 dblp:conf/dsn/LiuLSHGL15 fatcat:sfgjapjlbfagxnjdyslgo3aowq

Green-Up: under-provisioning power backup infrastructure for green datacenters

Xu Zhou, Zhibin Yu
2019 CCF Transactions on High Performance Computing  
However, how to under-provision the power backup facility for a green datacenter using renewable energy has not yet been explored.  ...  To evaluate Green-Up, we build an experimental cluster consisting of 10 servers with a simulated solar power generator, and use four representative datacenter benchmarks.  ...  We conduct a framework for dealing with power outages arising for the datacenters with aggressive backup power provision.  ... 
doi:10.1007/s42514-019-00016-6 fatcat:6hetyu4czzbjjha3f32wq7sfeu

Energy storage in datacenters

Di Wang, Chuangang Ren, Anand Sivasubramaniam, Bhuvan Urgaonkar, Hosam Fathy
2012 Performance Evaluation Review  
Energy storage -in the form of UPS units -in a datacenter has been primarily used to fail-over to diesel generators upon power outages.  ...  There has been recent interest in using these Energy Storage Devices (ESDs) for demand-response (DR) to either shift peak demand away from high tariff periods, or to shave demand allowing aggressive under-provisioning  ...  This typically takes a few seconds (at most a couple of minutes), and most datacenters provision UPS devices with lead-acid batteries of possibly 2X-3X this capacity.  ... 
doi:10.1145/2318857.2254780 fatcat:76ju2yfv7fgaxir7nud2dprgza

Energy storage in datacenters

Di Wang, Chuangang Ren, Anand Sivasubramaniam, Bhuvan Urgaonkar, Hosam Fathy
2012 Proceedings of the 12th ACM SIGMETRICS/PERFORMANCE joint international conference on Measurement and Modeling of Computer Systems - SIGMETRICS '12  
Energy storage -in the form of UPS units -in a datacenter has been primarily used to fail-over to diesel generators upon power outages.  ...  There has been recent interest in using these Energy Storage Devices (ESDs) for demand-response (DR) to either shift peak demand away from high tariff periods, or to shave demand allowing aggressive under-provisioning  ...  This typically takes a few seconds (at most a couple of minutes), and most datacenters provision UPS devices with lead-acid batteries of possibly 2X-3X this capacity.  ... 
doi:10.1145/2254756.2254780 dblp:conf/sigmetrics/WangRSUF12 fatcat:pilzovctdnetxkabgjvnp5277q

Underprovisioning backup power infrastructure for datacenters

Di Wang, Sriram Govindan, Anand Sivasubramaniam, Aman Kansal, Jie Liu, Badriddine Khessib
2014 Proceedings of the 19th international conference on Architectural support for programming languages and operating systems - ASPLOS '14  
possible for an application within the provisioned backup capacity during a power outage.  ...  While there has been prior work to underprovision the power distribution infrastructure for a datacenter to save costs, the ability to underprovision the backup power infrastructure, which contributes  ...  MaxPerf indicates the current datacenter practice with both DG and UPS provisioned with full power capacity (equivalent to datacenter peak requirement) and offers seamless performance during power outages  ... 
doi:10.1145/2541940.2541966 dblp:conf/asplos/WangGSKLK14 fatcat:5frja3uexvdzldiriyn4qfhkd4

Leveraging Heterogeneous Power for Improving Datacenter Efficiency and Resiliency

Longjun Liu, Chao Li, Hongbin Sun, Yang Hu, Jingmin Xin, Nanning Zheng, Tao Li
2015 IEEE computer architecture letters  
and demand has emerged as a top issue in modern datacenters that are under-provisioned or powered by intermittent power supplies.  ...  For example, unexpected load surge can easily generate power peaks that exceed the maximum power budget, leading to costly downtime in an under-provisioned datacenter.  ... 
doi:10.1109/lca.2014.2363084 fatcat:7bv775inwjgsjgkyf3zfktms2u

HEB

Longjun Liu, Chao Li, Hongbin Sun, Yang Hu, Juncheng Gu, Tao Li, Jingmin Xin, Nanning Zheng
2015 Proceedings of the 42nd Annual International Symposium on Computer Architecture - ISCA '15  
As a result, power mismatching between supply and demand has emerged as a crucial issue in modern data centers which are either under-provisioned or powered by intermittent power sources.  ...  Compared with a homogenous battery energy buffering system, HEB could improve energy efficiency by 39.7%, extend UPS lifetime by 4.7X, reduce system downtime by 41% and improve renewable energy utilization  ...  Currently, there are two primary techniques: (1) aggressively under-provisioned datacenter power infrastructures (a.k.a., power under-provisioned data centers), which has been proved as a meaningful methodology  ... 
doi:10.1145/2749469.2750384 dblp:conf/isca/LiuLSHGLXZ15 fatcat:h5antnqpijaptjzk3ittzxppm4

HEB

Longjun Liu, Chao Li, Hongbin Sun, Yang Hu, Juncheng Gu, Tao Li, Jingmin Xin, Nanning Zheng
2015 SIGARCH Computer Architecture News  
As a result, power mismatching between supply and demand has emerged as a crucial issue in modern data centers which are either under-provisioned or powered by intermittent power sources.  ...  Compared with a homogenous battery energy buffering system, HEB could improve energy efficiency by 39.7%, extend UPS lifetime by 4.7X, reduce system downtime by 41% and improve renewable energy utilization  ...  Currently, there are two primary techniques: (1) aggressively under-provisioned datacenter power infrastructures (a.k.a., power under-provisioned data centers), which has been proved as a meaningful methodology  ... 
doi:10.1145/2872887.2750384 fatcat:ug3wnt6tvfavvk6zirv3pxnbje

Managing distributed ups energy for effective power capping in data centers

Vasileios Kontorinis, Liuyi Eric Zhang, Baris Aksanli, Jack Sampson, Houman Homayoun, Eddie Pettis, Dean M. Tullsen, Tajana Simunic Rosing
2012 SIGARCH Computer Architecture News  
This work leverages the distributed nature of the UPS batteries and develops policies that prolong the duration of their usage.  ...  However, designing the power infrastructure for a lower operating power point than the aggregated peak power of all servers requires dynamic techniques to avoid high peak power costs and, even worse, tripping  ...  We describe how to provision the capacity of the battery and elaborate on how recharge cycles, the depth of discharge, and the workload power profile affect the potential for peak power shaving.  ... 
doi:10.1145/2366231.2337216 fatcat:i4y42rlz6rd7vffuy46hayobrm