Filters








627 Hits in 3.6 sec

D8.4: Final Report on Petascale Systems and Centre Assessment

Guillermo Aguirre, François Robin, Jean-Philippe Nominé, Marco Sbrighi
2012 Zenodo  
Task 2 - Design and operation of reliable and power efficient HPC computer centres - has produced a se [...]  ...  1); Design and operation of reliable and power efficient high performance computing (HPC) computer centres (task 2); Sharing of best practices for the procurement and installation of HPC systems (task  ...  for the procurement of HPC systems.  ... 
doi:10.5281/zenodo.6553025 fatcat:n6vcl4z4srapvl2usgepnvoqje

Ways to Decrease TCO and Infrastructure Related Costs

Willi Homberg
2017 Zenodo  
An analysis of Total Cost of Ownership (TCO) is widely used to support acquisition and planning decisions for a wide range of assets that bring significant maintenance or operating costs across ownership  ...  So there is a need for trade-off analysis taking all system and data infrastructure related costs into account. This also requires to make certain assu [...]  ...  Acknowledgement This work was financially supported by the PRACE project, partly funded by the Horizon 2020 -the Framework Programme for Research and Innovation (2014-2020) under Grant Agreement No. 730913  ... 
doi:10.5281/zenodo.2633662 fatcat:22ngqbbbhbacdmyixrauzf6uhi

D7.6.1: Procurement strategy

R. J. Blake
2008 Zenodo  
This deliverable overviews European procurement practices, summarises recent procurements by the Principal Partners within PRACE – reviews a number of recent international procurements and comments on  ...  This document builds on Deliverable 2.3.1 which summarised the procurement process on an abstract level in order to provide an overview of the different stages performed starting from a statement of requirements  ...  A system provided by IBM and consisting of a cluster of 2560 JS21 blade servers providing 10,240 IBM Power PC 970MP processors at 2.3 GHz for a peak performance of 94 Tflops.  ... 
doi:10.5281/zenodo.6546126 fatcat:kjba62k2pfdpxdvi5226hoyove

D5.4: HPC Infrastructures Workshop #9

Huub Stoffers
2018 Zenodo  
The workshop covered a broad range of topics relevant for HPC Centre Infrastructure management: standards and regulation, energy efficiency strategies, including heat-reuse, total cost of ownership reduction  ...  for HPC centres.  ...  TCO model for HPC procurement assessment -Eric Boyer, GENCI Eric Boyer, GENCI presented a TCO model that has been used in several procurements in France.  ... 
doi:10.5281/zenodo.6805973 fatcat:o2kwdb7xcvd3vc7lxurvesmrpa

Hpc Systems Procurement Best Practice

Richard Blake
2012 Zenodo  
At the heart of the procurement process is the need to define the requirements of the system – is it to procure a test vehicle for assessing new technologies, provide a solution to a specific application  ...  Is the expectation to have high availability, minimise the acquisition or running cost, maximise the capabilities, minimise the amount of time it takes to solve a problem, or a mix of the above?  ...  procurement models and mechanisms.  ... 
doi:10.5281/zenodo.814582 fatcat:4edcu5zosnb6hhz4sc7ywotnky

D5.3: Updated Best Practices for HPC Procurement and Infrastructure

Andreas Johansson
2014 Zenodo  
The PRACE-2IP Work Package 5 (WP5), "Best Practices for HPC Systems Commissioning", has two objectives: Procurement independent vendor relations and market watch (Task 1) Best practices for HPC Centre  ...  WP5 provides input for defining and updating procurement plans and strategies through the sharing of the state of the art and best practices in procuring and operating production HPC systems.  ...  This cannot be done by just scaling currently available codes, but by implementing a new paradigm for the development of advanced numerical methods to really exploit the intrinsic capabilities of the future  ... 
doi:10.5281/zenodo.6572433 fatcat:cwiqrgf33jajjjvhubky4f6rau

D2.2.4: PRACE Operational and Procurement Model

Pawlikowska Katarzyna, Sjoerd Meihuizen, Nicolas Mignerey
2012 Zenodo  
The first, part of this document is of interest for the future procurement of the machine(s) and considers which procurement model works best to maximize European industry engagement in HPC in relation  ...  We analyse five possibilities for operational models by describing their relation to procurement models, the strategic principles of PRACE, and the challenge of transiting from the current model to a new  ...  Table 9 : 9 Summary table of the evaluation of the models against the principles ..................................TCOTotal Cost of Ownership.Includes the costs (personnel, power, cooling, maintenance,  ... 
doi:10.5281/zenodo.6552944 fatcat:2nl6ud6qe5hpnlx7s55n45xzl4

Practical Resource Management in Power-Constrained, High Performance Computing

Tapasya Patki, David K. Lowenthal, Anjana Sasidharan, Matthias Maiterth, Barry L. Rountree, Martin Schulz, Bronis R. de Supinski
2015 Proceedings of the 24th International Symposium on High-Performance Parallel and Distributed Computing - HPDC '15  
Within RMAP, we design and analyze an adaptive policy, which derives job-level power bounds in a fair-share manner and supports overprovisioning and power-aware backfilling.  ...  The goals for RMAP are to improve application performance as well as system power utilization, and thus minimize the average turnaround time for all jobs.  ...  While procuring this amount of power poses a problem, utilizing it efficiently is an even bigger challenge.  ... 
doi:10.1145/2749246.2749262 dblp:conf/hpdc/PatkiLSMRSS15 fatcat:c6vq5fofcfhuhhp4n3ajquuevy

EuroEXA: an innovative and scalable FPGA-based system for extreme scale computing in Europe

Piero Vicini, Andrea Biagioni, Enrico Calore, Paolo Cretaro, Ottorino Frezza, Francesca Lo Cicero, Alessandro Lonardo, Pier Stanislao Paolucci, Sebastiano Schifano, Francesco Simula
2019 Zenodo  
project-designed, ARM-based, low power multi-core chip.  ...  The EU HPC strategy, funded through EuroHPC initiative, leverages on two different pillars: the first one targets the procurement and the hosting of two/three commercial pre-Exascale systems, in order  ...  projects(2014)(2015)(2016)(2017)(2018)(2019) to pave the way to European HPC systems https://eurohpc-ju.europa.eu/ EuroEXA leverages on ExaNeSt, ExaNoDe and ECOSCALE results to deliver a world-class HPC  ... 
doi:10.5281/zenodo.3599469 fatcat:mkcqngaxercyvodgvtulfpuqc4

D5.2: Best Practices for HPC Procurement and Infrastructure

Norbert Meyer, Marcin Lawenda
2013 Zenodo  
The PRACE-2IP Work Package 5 (WP5), "Best Practices for HPC Systems Commissioning", has two objectives: Procurement independent vendor relations and market watch (Task 1) Best practices for HPC Centre  ...  Task 2 – Best practices for designing and operating power efficient HPC centre infrastructures – has continued the production of white papers which explore specific topics related to HPC data c [...]  ...  Application-Aware Energy Efficiency HPC via Dynamic Voltage-Frequency Scaling (DVFS) at ISC 2013 The energy cost of running HPC systems is growing to a point where it can easily exceed the cost of the  ... 
doi:10.5281/zenodo.6572412 fatcat:2bqftmr5zzb7na6pnlrlxxuqnu

D1.5 Final Report

Thomas Eickerman
2010 Zenodo  
The mission of this Preparatory Phase project has been to prepare for the creation of a persistent pan-European HPC-service as a permanent Research Infrastructure as envisioned in the ESFRI Roadmap.  ...  The service will be provided by 3-5 superior centres that will form the Tier-0 level of the European HPC ecosystem.  ...  TCO Total Cost of Ownership. Includes the costs (personnel, power, cooling, maintenance, ...) in addition to the purchase cost of a system. UNICORE Uniform Interface to Computing Resources.  ... 
doi:10.5281/zenodo.6542563 fatcat:wm54iuaen5aj5nqgubdco3smpq

D5.3: HPC Infrastructures Workshop #8

Huub Stoffers
2017 Zenodo  
The workshop covered a broad range of topics relevant for HPC Centre Infrastructure management: standards and regulations, energy effciency strategies, total cost of ownership reduction strategies, energy  ...  storage technologies, and trends in the design as well as procurement procedures for datacentres.  ...  PRACE-5IP WP5 white paper purpose and goals are to: • Define best practices for using TCO analysis in the procurement of HPC systems • Make aware of the most relevant cost factors which must be considered  ... 
doi:10.5281/zenodo.6805971 fatcat:rkbmbos4qzhupm5bzqvo7q5dsi

D2.6: Cross-border Collaboration in the Context of EOSC

René Belsø, Per-Olov Hammargren, Lars-Owe Ivarsson, Pirjo Kontkanen, Leah Riungu-Kalliosaari, Lars Fischer, Sara Garavelli
2022 Zenodo  
This leads to the discussion about cross-border funding models, cross-border cost recovery, or simply collaboration models.  ...  EOSC such as the following ones: ● Trying to identify a single funding model for EOSC is very challenging and not an appropriate solution.  ...  Cost drivers The costs of the resources (TCO) is determined by a number of complex yet very important factors: • cost of HPC hardware, where economy of scale is significant • cost of electricity for HPC  ... 
doi:10.5281/zenodo.6217744 fatcat:vf44z2gipnay5fssogbied6zkm

Survey of Memory Management Techniques for HPC and Cloud Computing

Anna Pupykina, Giovanni Agosta
2019 IEEE Access  
The emergence of new classes of HPC applications and usage models, such as real-time HPC and cloud HPC, coupled with the increasingly heterogeneous nature of HPC architectures, requires a renewed investigation  ...  However, for this scenario to succeed in practice, resources, including memory, need to be allocated with a vision that includes both the application requirements and the current and future state of the  ...  all resources independently; memory power model: a set of power models for CPU, memory, etc. takes into account resource specifications, then all power models are integrated to provide optimal or nearoptimal  ... 
doi:10.1109/access.2019.2954169 fatcat:hwtpltrdrffqdjdofhr3shjkla

Dark Silicon: From Embedded to HPC Systems (Dagstuhl Seminar 16052)

Hans Michael Gerndt, Michael Glaß, Sri Parameswaran, Barry L. Rountree, Marc Herbstritt
2016 Dagstuhl Reports  
However, this is not only an emerging threat for SoC and MPSoC designers, HPC faces a similar problem as well: The power supplied by the energy companies as well as the cooling capacity does not allow  ...  based on more flexible thermal/power/resource management techniques both for runtime, design time as well as hybrid solutions.  ...  Power-aware scheduling, presented by Tapasya Patki and Andrea Bartolini, can significantly improve the throughput of power-limit HPC systems and moldable jobs can improve the effect of power-aware scheduling  ... 
doi:10.4230/dagrep.6.1.224 dblp:journals/dagstuhl-reports/GerndtGPR16 fatcat:fnfmxyiknfehxfnlomovzifrh4
« Previous Showing results 1 — 15 out of 627 results