Research on a Multi-project Scheduling Optimization Algorithm with Resource Time-Windows

Song-lin LI, Xing-ye DONG, Sheng HAN
2017 DEStech Transactions on Computer Science and Engineering  
A resource-constrained multi-project scheduling problem with resource time-windows model is established aimed at minimizing the makespan of multi-project.  ...  In terms of solution method, a heuristic algorithm based on Serial Scheduling Generated Scheme is designed to generate an initial solution and a tabu search algorithm is proposed to optimize the solution  ...  In this paper, we propose a resource-constrained multi-project scheduling problem with resource time-windows (RCMPSPTW) model which is suitable for solving the possible breakdown of resources and aimed  ... 
doi:10.12783/dtcse/cmsam2017/16411 fatcat:vqm6qnrvrjav5osz4nxjm7vgku

Page 4800 of Mathematical Reviews Vol. , Issue 2003f [page]

2003 Mathematical Reviews  
scheduling with time windows: models, solution methods, and applications.  ...  A dy- namic programming algorithm with O(N‘ /F*~7) running time is presented to find an optimal schedule.  ... 

Task network-based project dynamic scheduling and schedule coordination

Qi Hao, Weiming Shen, Yunjiao Xue, Shuying Wang
2010 Advanced Engineering Informatics  
lang=fr Access and use of this website and the material on it are subject to the Terms and Conditions set forth at Task network-based project dynamic scheduling and schedule coordination Hao, Q.; Shen,  ...  W.; Xue, Y.; Wang, S. http://www.nrc-cnrc.gc.ca/irc T a sk ne t w ork -ba se d proje c t dyna m ic sc he duling a nd sc he dule c oordina t ion NRCC-52705 Hao, Q.; Shen, W.; Xu, Y.; Wang, S.  ...  Figure 5 shows a Gantt chart view of a project schedule. The coordination of multiple projects starts with an interface to input a time window and select projects in scope.  ... 
doi:10.1016/j.aei.2010.07.001 fatcat:zprlra5khzbcdepmbz7fddqpbq

A Dynamic Scheduling Method for Carrier Aircraft Support Operation under Uncertain Conditions Based on Rolling Horizon Strategy

Peilong Yuan, Wei Han, Xichao Su, Jie Liu, Jingyu Song
2018 Applied Sciences  
a multi-resource constrained multi-project scheduling problem (MRCMPSP), which is a complex non-deterministic polynomial-time hard (NP-hard) problem.  ...  A periodic and event-driven rolling horizon (RH) scheduling strategy inspired by the RH optimization method from predictive control technology is presented for the dynamic scheduling environment.  ...  The RH window can be continuously updated along with the scheduling time. A number of activities are selected and scheduled from activities waiting for processing in an activities window.  ... 
doi:10.3390/app8091546 fatcat:nrn45ft3zvg3fa5lttm4avweji

Reactive scheduling based on actual logistics data by applying simulation-based optimization

Kamil Szczesny, Markus König
2015 Visualization in Engineering  
This helps construction project managers to improve the management and monitoring of construction projects by reducing the time-consuming, error-prone process of updating inconsistent schedules.  ...  Currently, the integration of such data into construction schedules is a time-consuming, manual and, thus, error-prone process.  ...  For this, a sensitivity analysis based on the α-cut method is utilized.  ... 
doi:10.1186/s40327-015-0020-8 fatcat:gbgt427fg5dpricrk7blayhnwi

Nuclear Power Plant Construction Scheduling Problem with Time Restrictions: A Particle Swarm Optimization Approach

Shang-Kuan Chen, Yen-Wu Ti, Kuo-Yu Tsai
2016 Science and Technology of Nuclear Installations  
In nuclear power plant construction scheduling, a project is generally defined by its dependent preparation time, the time required for construction, and its reactor installation time.  ...  In this paper, a hierarchical particle swarm optimization algorithm is proposed to solve the nuclear power plant construction scheduling problem and minimize the occurrence of projects failing to achieve  ...  and time window for the delivery process.  ... 
doi:10.1155/2016/2150692 fatcat:qfcpa7j3bzaqdepejhszdsqfvi

Knowledge-based scheduling systems in industry and medicine

J. Sauer, R. Bruns
1997 IEEE Expert  
The first principle leads to a common architecture for all our scheduling systems, consisting of a graphical user interface, a knowledge base, an interface component, and a knowledge-based algorithms component  ...  The framework Our generic framework is based on two design principles: • The combination of standard computer science components (for example, professional user interfaces and databases) with knowledge-based  ...  The user schedules a patient by selecting a time unit of an operating theater in the Bettenbelegung window. Medicus automatically assigns the appropriate hospital beds if no constraints are violated.  ... 
doi:10.1109/64.577410 fatcat:4diutzczurehngllpr3ajb46lu

Page 788 of The Journal of the Operational Research Society Vol. 52, Issue 7 [page]

2001 The Journal of the Operational Research Society  
Resource-constrained project scheduling with time windows: a branching scheme based on dynamic release dates.  ...  A new branch-and bound-based heuristic for resource-constrained project scheduling with minimal and maximal time lags. In: Weglarz } (ed).  ... 

Knowledge-Based Scheduling Analysis Software for Highway Rehabilitation and Reconstruction Projects

Eul-Bum Lee, John T. Harvey, Michael M. Samadian
2005 Transportation Research Record  
As a knowledge-based computer system on a Microsoft Access database, it uses Monte Carlo simulation, critical path method (CPM) analysis, and linear scheduling technique.  ...  This paper presents a construction simulation program, called CA4PRS (Construction Analysis for Pavement Rehabilitation Strategies), developed as a scheduling and production analysis tool for LLPRS projects  ...  (Concurrent-method) Partial-closure (Sequential-method) Pavement base types AC base Lean concrete base Scheduling constraints (activity lead-lag time relationships) Mobilization Demobilization  ... 
doi:10.1177/0361198105190700103 fatcat:okyrr7xw5jf57ltd46bx3nue3e

Knowledge-Based Scheduling Analysis Software for Highway Rehabilitation and Reconstruction Projects

Eul-Bum Lee, John Harvey, Michael Samadian
2005 Transportation Research Record  
As a knowledge-based computer system on a Microsoft Access database, it uses Monte Carlo simulation, critical path method (CPM) analysis, and linear scheduling technique.  ...  This paper presents a construction simulation program, called CA4PRS (Construction Analysis for Pavement Rehabilitation Strategies), developed as a scheduling and production analysis tool for LLPRS projects  ...  (Concurrent-method) Partial-closure (Sequential-method) Pavement base types AC base Lean concrete base Scheduling constraints (activity lead-lag time relationships) Mobilization Demobilization  ... 
doi:10.3141/1907-03 fatcat:yxhinmhua5fevepthmjywvalbq

Project scheduling with resource capacities and requests varying with time: a case study

Sönke Hartmann
2012 Flexible Services and Manufacturing Journal  
A real-world medical research project is presented which has a structure that is typical for many other medical and pharmacological research projects that consist of experiments.  ...  Finally, we report our computational results for the original data of the medical research project as well as for a set of systematically generated test instances.  ...  Project scheduling with resource capacities Acknowledgement I would like to thank Thies Fitting for providing the relevant data of the medical research project (and for noticing that he had to deal with  ... 
doi:10.1007/s10696-012-9141-8 fatcat:6mdmg3su6ne7rnrnhenkrhml74

Disruption management for resource-constrained project scheduling

G Zhu, J F Bard, G Yu
2005 Journal of the Operational Research Society  
In this paper, we study the problem of how to react when an ongoing project is disrupted. The focus is on the resourceconstrained project scheduling problem with finish-start precedence constraints.  ...  The problem is formulated as an integer linear program and solved with a hybrid mixed-inter programming/constraint programming procedure that exploits a number of special features in the constraints.  ...  Based on the propagation of the precedence constraints for branch 2, activity 5 with duration 3 will now have a finish time window of [18, 27] and activity 7 will have a finish time window of [21, 27  ... 
doi:10.1057/palgrave.jors.2601860 fatcat:2jqwlbqxbfau7nsilgd66rjnye

Conflict-Based Repair Techniques for Solving Dynamic Scheduling Problems [chapter]

Abdallah Elkhyari, Christelle Guéret, Narendra Jussien
2002 Lecture Notes in Computer Science  
This histogram is used for detecting a contradiction and reducing the time-window of activities. The core-times technique [3] is used for computing lower bounds using a destructive method.  ...  Explanations for Scheduling-Related Global Constraints The Resource Constrained Project Scheduling Problem (rcpsp) is a general scheduling problem.  ... 
doi:10.1007/3-540-46135-3_49 fatcat:t4hyffimx5grzehmzglpcz2ukm

Project Scheduling Approach to Production Planning

A. Márkus, J. Váncza, T. Kis, A. Kovács
2003 CIRP annals  
Orders are modelled as projects that compete for limited resources. The projects consist of networks of variable-intensity activities which may require several resources at the same time.  ...  Although the capacity and material flow aspects of PP are coupled, a special solver developed for the project model efficiently solves problems of real-life sizes.  ...  Then, the first two weeks' production plan was passed to a constraint-based finite job-shop scheduler that worked with a 0.1 hour time unit.  ... 
doi:10.1016/s0007-8506(07)60601-5 fatcat:bwqfnropznemdd2xxczm3flti4

A decision support system to schedule design activities with interdependency and resource constraints

Iban Lizarralde, Patrick Esquirol, Arnaud Riviere
2011 Projectics / Proyéctica / Projectique  
/ projectique -n° 7 89 A DEcISION SUPPORT SYSTEM TO ScHEDUlE DESIGN AcTIvITIES WITH INTERDEPENDENcY ABsTRACT This paper investigates the problems of project scheduling at the design stage of the development  ...  Moreover, design teams responsible for the development of a subsystem need to manage interactions with other teams.  ...  Activities may be submitted to individual time window constraints, defined by an earliest start period r i and a latest ending period d i , with 1 ≤ r i ≤ d i ≤ H.  ... 
doi:10.3917/proj.007.0089 fatcat:ipof2ikizrb57c2hl2r3of42mm