via grobid
|
Heuristic and Metaheuristic Methods for the Unrelated Machines Scheduling Problem: A Survey
[article]
Marko Đurasević,
Domagoj Jakobović
2021
pre-print
version:v1
arXiv:2107.13106v1
|
web.archive.org
[PDF]
|
via crossref
|
Just-in-time scheduling in identical parallel machine sequence-dependent group scheduling problem
Alireza Goli,
Taha Keshavarz
2021
Journal of Industrial and Management Optimization
doi:10.3934/jimo.2021124
|
web.archive.org
[PDF]
|
via grobid
|
<b>A genetic algorithm and variable neighborhood search for the unrelated parallel machine scheduling problem with sequence dependent setup time
Everton Tozzo,
Syntia Lemos Cotrim,
Edwin Vladimir Cardoza Galdamez,
Gislaine Camila Lapasini Leal
2018
Acta Scientiarum: Technology
doi:10.4025/actascitechnol.v40i1.36607
|
web.archive.org
[PDF]
|
via crossref
|
A constraint programming approach for solving unrelated parallel machine scheduling problem
Ridvan Gedik,
Darshan Kalathia,
Gokhan Egilmez,
Emre Kirac
2018
Computers & industrial engineering
doi:10.1016/j.cie.2018.05.014
|
|
via crossref
|
Loading and sequencing heuristics for job scheduling on two unrelated parallel machines with long, sequence-dependent set-up times
Jürgen Strohhecker,
Michael Hamann,
Jörn-Henrik Thun
2016
International Journal of Production Research
doi:10.1080/00207543.2016.1173248
|
|
via crossref
|
Unrelated parallel-machine scheduling with position-dependent deteriorating jobs and resource-dependent processing time
Chou-Jung Hsu,
Dar-Li Yang
2012
Optimization Letters
doi:10.1007/s11590-012-0594-1
|
|
via crossref
|
VARIABLE NEIGHBORHOOD DESCENT FOR THE UNRELATED PARALLEL MACHINE SCHEDULING PROBLEM
CHRISTOFOROS CHARALAMBOUS,
KRZYSZTOF FLESZAR
2012
International journal on artificial intelligence tools
doi:10.1142/s0218213012400192
|
|
via crossref
|
Scheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraints
Jacques Lamothe,
Francois Marmier,
Matthieu Dupuy,
Paul Gaborit,
Lionel Dupont
2012
Computers & Operations Research
doi:10.1016/j.cor.2010.07.007
|
web.archive.org
[PDF]
|
via crossref
|
Unrelated parallel-machine scheduling with deteriorating maintenance activities to minimize the total completion time
Li-Yan Wang,
Xue Huang,
Ping Ji,
En-Min Feng
2012
Optimization Letters
doi:10.1007/s11590-012-0472-x
|
|
via crossref
|
A variable neighborhood descent heuristic for the problem of makespan minimisation on unrelated parallel machines with setup times
Krzysztof Fleszar,
Christoforos Charalambous,
Khalil S. Hindi
2011
Journal of Intelligent Manufacturing
doi:10.1007/s10845-011-0522-8
|
|
via crossref
|
Capacitated lot sizing and sequence dependent setup scheduling: an iterative approach for integration
Geraldo R. Mateus,
Martín G. Ravetti,
Maurício C. de Souza,
Taís M. Valeriano
2009
Journal of Scheduling
doi:10.1007/s10951-009-0156-2
|
|
via fuzzy
|
Solving parallel machines scheduling problems with sequence-dependent setup times using variable neighbourhood search
Mateus Rocha de Paula,
Martín Gómez Ravetti,
Geraldo Robson Mateus,
Panos M. Pardalos
2007
IMA Journal of Management Mathematics
doi:10.1093/imaman/dpm016
|
web.archive.org
[PDF]
|
via fuzzy
|
Problema de programación de lotes cíclicos con tiempos de preparación dependientes e independientes de la secuencia con aplicaciónes a sistemas de pintura.
[thesis]
JORGE ARTURO MARTÍNEZ ORTIZ
doi:10.4995/thesis/10251/59068
|
web.archive.org
[PDF]
|
via fuzzy
|
Programação de frota de apoio a operações 'offshore' sujeita à requisição de múltiplas embarcações para uma mesma tarefa.
[thesis]
André Bergsten Mendes
doi:10.11606/t.3.2007.tde-14012008-171216
|
web.archive.org
[PDF]
|