Energy and Exergy Analysis of 6 MW Gas Power Plant at BOB PT. Bumi Siak Pusako - Pertamina Hulu
release_xvgd3zt5evfydid5zb4bkltbwi
by
Mohammad Barbarosa,
Mechanical Engineering Department, Faculty of Engineering, Universitas Riau, Indonesia,
Awaludin Martin,
Yogie R. Ginting,
Mechanical Engineering Department, Faculty of Engineering, Universitas Riau, Indonesia,
Mechanical Engineering Department, Faculty of Engineering, Universitas Riau, Indonesia
2022 Volume 66, p82-88
Abstract
BOB PT. Bumi Siak Pusako – Pertamina Hulu is Indonesian Operator Company that uses gas power plant for Pekanbaru Coastal Plan (CPP) block. The 4x6 MW energy capacities must follow energy, exergy, economics analysis and environmental impacts due to CO² emission and exhaust gas temperature. From the analysis, the gas power plant thermal efficiency is 42.85%, exegetic efficiency is 33.22% with the largest exergy loss of 18.7 kW in combustion chamber, 7.1 kW in compressor, and 2.69 kW in gas turbine with total cost loss due to exergy destruction of 2,537.52 $/hour. The cost loss value is 1362.45 $/hour for compressor, 1,962.28 $/hour for combustion chamber, and 212.79 $/hour for gas turbine. The exhaust emission is 0.21 kg/s, forest area required to absorb pollution is 11.63 ha, exhaust heat released is 1913.51 kW. This study indicates that the analytical method carried out can be developed and applied comprehensively to generating facilities in Indonesia.
In application/xml+jats
format
Archived Files and Locations
application/pdf
671.1 kB
file_gi422bzcarbgrczvmcf37xmgh4
|
isomase.org (publisher) web.archive.org (webarchive) |
article-journal
Stage
published
Date 2022-11-30
access all versions, variants, and formats of this works (eg, pre-prints)
Crossref Metadata (via API)
Worldcat
SHERPA/RoMEO (journal policies)
wikidata.org
CORE.ac.uk
Semantic Scholar
Google Scholar