Fadli, M.R., Sulistiyowati, W., 2021. Optimization of Pipe Production Scheduling in Line 18 Using First Come First Serve (Fcfs), Earlier Due Date (Edd), Short Process Time (Spt) Methods (Case Study: Pt Wtur).. https://doi.org/10.21070/prozima.v3i2.1268