Understanding implementation barriers in the national scale-up of differentiated ART delivery in Uganda
release_h6sldgkucbatvnkgdtq4ofyxni
by
Henry Zakumumpa,
Joseph Rujumba,
Japheth Kwiringira,
Cordelia Katureebe,
Neil Spicer
2020 Volume 20, Issue 1, p222
Abstract
Although Differentiated Service Delivery (DSD) for anti-retroviral therapy (ART) has been rolled-out nationally in several countries since World Health Organization (WHO)'s landmark 2016 guidelines, there is little research evaluating post-implementation outcomes. The objective of this study was to explore patients' and HIV service managers' perspectives on barriers to implementation of Differentiated ART service delivery in Uganda.
We employed a qualitative descriptive design involving 124 participants. Between April and June 2019 we conducted 76 qualitative interviews with national-level HIV program managers (n = 18), District Health Team leaders (n = 24), representatives of PEPFAR implementing organizations (11), ART clinic in-charges (23) in six purposively selected Uganda districts with a high HIV burden (Kampala, Luwero, Wakiso, Mbale, Budadiri, Bulambuli). Six focus group discussions (48 participants) were held with patients enrolled in DSD models in case-study districts. Data were analyzed by thematic approach as guided by a multi-level analytical framework: Individual-level factors; Health-system factors; Community factors; and Context.
Our data shows that multiple barriers have been encountered in DSD implementation. Individual-level: Individualized stigma and a fear of detachment from health facilities by stable patients enrolled in community-based models were reported as bottlenecks. Socio-economic status was reported to have an influence on patient selection of DSD models. Health-system: Insufficient training of health workers in DSD delivery and supply chain barriers to multi-month ART dispensing were identified as constraints. Patients perceived current selection of DSD models to be provider-intensive and not sufficiently patient-centred. Community: Community-level stigma and insufficient funding to providers to fully operationalize community drug pick-up points were identified as limitations.
Frequent changes in physical addresses among urban clients were reported to impede the running of patient groups of rotating ART refill pick-ups.
This is one of the first multi-stakeholder evaluations of national DSD implementation in Uganda since initial roll-out in 2017. Multi-level interventions are needed to accelerate further DSD implementation in Uganda from demand-side (addressing HIV-related stigma, community engagement) and supply-side dimensions (strengthening ART supply chain capacities, increasing funding for community models and further DSD program design to improve patient-centeredness).
In text/plain
format
Archived Files and Locations
application/pdf
1.3 MB
file_pnr24vyznbhmrle7l3yb4ivkki
|
bmchealthservres.biomedcentral.com (publisher) web.archive.org (webarchive) |
Open Access Publication
In DOAJ
In ISSN ROAD
In Keepers Registry
ISSN-L:
1472-6963
access all versions, variants, and formats of this works (eg, pre-prints)
Crossref Metadata (via API)
Worldcat
SHERPA/RoMEO (journal policies)
wikidata.org
CORE.ac.uk
Semantic Scholar
Google Scholar